Summary Introduction

Interpretation: Factors through which the current layout can be improved are to be disussed.

Concept Introduction:

New layout techniques are generally used to minimize the material handling cost across multiple departments. Multiple handling cost depends upon the numerous factors such as total distance across the departments and number of trips across the departments.

Blurred answer
Students have asked these similar questions
Consider the example of the machine shop with the from-to charts given in Figures 11–3 through 11–5. Based on the results of Figure 11–5, in what ways might the current layout be improved?
You have just been hired as the director of operations for Reid Chocolates, a purveyor of exceptionally fine candies. Reid Chocolates is evaluating a kitchen layout under consideration for its recipe making and testing department. The strategy is to provide the best kitchen layout possible so that food scientists can devote their time and energy to product improvement, not wasted effort in the kitchen. Figure 1. Number of trips between work centers To: From: Refrigerator Counter Sink Storage Stove Refrigerator (1) 7 4 3 0 Counter (2) 12 Refrig. Figure 2. Kitchen Layout 12 0 8 Counter Sink Storage 5 For this layout, the cumulative "load x distance" or "movement cost" = A possible kitchen layout is shown in Figure 2 below. The walking distance between the areas is in feet. For example, the distance from area 1 to area 2 is 5 feet, area 1 to area 5 is 13 feet. 8 11 13 11 Sink (3) 13 4 5 0 6 Storage (4) 0 5 5 Stove 11 Stove (5) 0 9 0 6 feet (enter your response as a whole number).
You are required to make a study on the layout design. In this line, you need to analyse the layout design and provide possible suggestions for improvement on the existing layout efficiency. You can consider either manufacturing or service providers in Oman. All the design and suggestion should be presented in a report for a submission. Tasks performed incl 1.Study the layout design of the existing systems. 2 Study the layout design of the suggested systems. 3. Suggest on the mechanism of improving the layout design.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.