Production and Operations Analysis, Seventh Edition
7th Edition
ISBN: 9781478623069
Author: Steven Nahmias, Tava Lennon Olsen
Publisher: Waveland Press, Inc.
expand_more
expand_more
format_list_bulleted
Question
Chapter 12.1, Problem 3P
Summary Introduction
Interpretation: Z score and Rejection probability needs to be calculated based on the given data.
Concept Introduction: Z score is an important statistical metric on basis of which probabilities can be calculated within
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A cosmetics company fills its best selling jars of facial cream by an automatic dispensing machine. The machine is set to dispense a mean of 7.2 ounces per jar. Uncontrollable factors in the process can cause either underfill or overfill, both of which are undesireable. In such a case, the dispensing can be stopped and recalibrated. Regardless of the mean amount despensed, the standard deviation of the amount dispwnsed always has a value of 0.25 ounce. A quality control engineer routinely selects 36 jars from the assembly line to check the amounts filled. On one occasion, the sample mean is 7.8 ounces. Determine if there is sufficient evidence in the sample to indicate, at the 1% level of significance, that the machine should be recalibrated.
STAR Co. provides paper to smaller companies with volumes that are not large enough to warrant dealing directly with the paper mill. STAR receives 100-feet-wide paper rolls from the mill and cuts
the rolls into smaller rolls of widths 12, 15, and 30 feet. The demands for these widths vary from week to week. The following cutting patterns have been established.
12-ft 15-ft 30-ft Trim Loss (ft)
Min
s.t.
12-f
Pattern Number
15-1
1
30-1
2
3
4
5
0
D
8
3
7
6
0
0
0
1
0
3
0
2
0
10
Trim loss is the leftover paper from a pattern (e.g., for pattern 4, 3(12)+ 0(15) + 2(30) 96 feet used results in 100-96-4 foot of trim loss). Orders in hand for the coming week are 5,660 12-
foot rolls, 1,690 15-foot rolls, and 3,340 30-foot rolls. Any of the three types of rolls produced in excess of the orders in hand will be sold on the open market at the selling price. No inventory is held.
10
(a) Formulate an integer programming model that will determine how many 100-foot rolls to cut into each of the five…
Deborah Holwager, a concessionaire for the Amway Center in Orlando, has developed a table of conditional values for the
various alternatives (stocking decision) and states of nature (size of crowd)
Alternatives
States of Nature (size of crowd)
Large
Average
Small
Large Inventory
Ave yge Inventory
Smal Inventory
$12,000
-51,000
$18,000
$15.000
$16,000
$4,000
$10,000
$5,000
Probabilities associated with the states of nature are 0.35 for a large crowd, 0.50 for an average crowd, and 0.15 for a small crowd.
$6.000
a) The alternative that provides Deborah the greatest oxpected monetary value (EMV) is
The EMV for this decision is s (enter your answer as a whole number).
Chapter 12 Solutions
Production and Operations Analysis, Seventh Edition
Ch. 12.1 - Prob. 2PCh. 12.1 - Prob. 3PCh. 12.1 - Prob. 4PCh. 12.1 - Prob. 5PCh. 12.1 - Prob. 6PCh. 12.2 - Prob. 7PCh. 12.2 - Prob. 8PCh. 12.2 - Prob. 9PCh. 12.2 - Prob. 10PCh. 12.2 - Prob. 11P
Ch. 12.2 - Prob. 12PCh. 12.2 - Prob. 13PCh. 12.3 - Prob. 14PCh. 12.3 - Prob. 15PCh. 12.3 - Prob. 16PCh. 12.3 - Prob. 17PCh. 12.4 - Prob. 18PCh. 12.4 - Prob. 19PCh. 12.4 - Prob. 20PCh. 12.4 - Prob. 21PCh. 12.5 - Prob. 22PCh. 12.6 - Prob. 23PCh. 12.6 - Prob. 24PCh. 12.6 - Prob. 25PCh. 12.6 - Prob. 26PCh. 12.6 - Prob. 27PCh. 12.6 - Prob. 28PCh. 12.9 - Prob. 29PCh. 12.9 - Prob. 30PCh. 12.9 - Prob. 31PCh. 12.9 - Prob. 32PCh. 12.9 - Prob. 33PCh. 12.10 - Prob. 34PCh. 12.10 - Prob. 35PCh. 12.10 - Prob. 37PCh. 12.10 - Prob. 38PCh. 12.10 - Prob. 39PCh. 12.10 - Prob. 40PCh. 12.11 - Prob. 41PCh. 12.11 - Prob. 42PCh. 12.11 - Prob. 43PCh. 12.11 - Prob. 44PCh. 12.12 - Prob. 46PCh. 12.12 - Prob. 47PCh. 12.12 - Prob. 48PCh. 12 - Prob. 49APCh. 12 - Prob. 50APCh. 12 - Prob. 51APCh. 12 - Prob. 52APCh. 12 - Prob. 53APCh. 12 - Prob. 54APCh. 12 - Prob. 55APCh. 12 - Prob. 57APCh. 12 - Prob. 58APCh. 12 - Prob. 59APCh. 12 - Prob. 60APCh. 12 - Prob. 61APCh. 12 - Prob. 62APCh. 12 - Prob. 63APCh. 12 - Prob. 64APCh. 12 - Prob. 65APCh. 12 - Prob. 66APCh. 12 - Prob. 67APCh. 12 - Prob. 68APCh. 12 - Prob. 69APCh. 12 - Prob. 70AP
Knowledge Booster
Similar questions
- At the beginning of each week, a machine is in one of four conditions: 1 = excellent; 2 = good; 3 = average; 4 = bad. The weekly revenue earned by a machine in state 1, 2, 3, or 4 is 100, 90, 50, or 10, respectively. After observing the condition of the machine at the beginning of the week, the company has the option, for a cost of 200, of instantaneously replacing the machine with an excellent machine. The quality of the machine deteriorates over time, as shown in the file P10 41.xlsx. Four maintenance policies are under consideration: Policy 1: Never replace a machine. Policy 2: Immediately replace a bad machine. Policy 3: Immediately replace a bad or average machine. Policy 4: Immediately replace a bad, average, or good machine. Simulate each of these policies for 50 weeks (using at least 250 iterations each) to determine the policy that maximizes expected weekly profit. Assume that the machine at the beginning of week 1 is excellent.arrow_forwardThe warehouse management system (WMS) of RoyaTech's Delaware Valley warehouse tracks service level at the warehouse. A service level failure at the warehouse is an event where a customer's order could not be shipped out in full by the promised shipping time. RoyalTech's ordering system prevents customers from placing orders on products that are not in-stock at the warehouse. Therefore, we can make the statement that "the WMS is guaranteed to show 100% service level at the warehouse." Choose the most appropriate statement in response: O True, because orders will be placed only for products that are available. O False, because service level can never be 100%. O False, because resource constraint or human error may delay the shipping even though inventory is available in the system. O False, because WMS calculations are faulty.arrow_forwardA computer manufacturer discovers through experience that an average of 6 defective hard drives are found in every 100 hard drives manufactured. How many defective hard drives are expected to be found in the production of 1900 hard drives?arrow_forward
- You are a food specialist in a company that specializes inrefrigerated delicacies, and one of your brands requires beingmaintained at a temperature of 5°C. You determine averagewater activity (aw) at this temperature to be 0.2. One day, you are informed that the cooling systems onone of the delivery trucks carrying your company’s productsmalfunctioned while en route to its destination and it would notbe fixed until the next delivery. The driver has informed you thatthe temperature in the delivery bay of the truck is averaging55°C. You estimate a heat of sorption (Q) of 19 kJ/mol. Calculate the water activity of the brand at this elevatedtemperature and comment on it’s integrity. Should the deliverystill push through? Or should the products be recalled anddisposedarrow_forwardA wheel tractor-scraper is carrying a 50,000 lb load while operating on a level grade. Assume no power derating is required for equipment condition, altitude, and temperature. What minimum value of coefficient of traction between the tractor wheels and the traveling surface is needed to overcome an equivalent rolling resistance of 12%? For the fully loaded condition 40% of the weight is distributed to the drive axle. Operating weight of the scraper when empty is 70,000 lb.6.4 (5 pts) A wheel tractor-scraper is carrying a 50,000 lb load while operating on a level grade. Assume no power derating is required for equipment condition, altitude, and temperature. What minimum value of coefficient of traction between the tractor wheels and the traveling surface is needed to overcome an equivalent rolling resistance of 12%? For the fully loaded condition 40% of the weight is distributed to the drive axle. Operating weight of the scraper when empty is 70,000 lb.arrow_forwardOutput from a process contains 0.02 defective unit. Defective units that go undetected into final assemblies cost $25 each to replace. An inspection process, which would detect and remove all defectives, can be established to test these units. However, the inspector, who can test 20 units per hour, is paid $8 per hour, including fringe benefits. Should an inspection station be established to test all units? Assume that the line will operate at the same rate (i.e., the current production rate) regardless of whether or not the inspection operation is added. a-1. Without the inspector, what is the current hourly cost of defects? a-2. Should an inspection station be established to test all units based on costs alone? multiple choice Yes No a-3. If the inspection operation is added, what would be the cost to inspect each unit? Note: Round your answer to 2 decimal places. b. What would be the benefit (or loss) from establishing the inspection process? Note: Round your answer…arrow_forward
- i need help with calculating rate of diffusion for 3 crystals and 6 crystals Diffusion Diffusion Diffusion Spot Spot Time Spot Diameter 1 Diameter 3 Diameter 6 (min) Crystal Crystals Crystals (mm) (mm) (mm) 10 15 0-15 0-15 20 16 0-16 0-16 30 18 0-18 0-18 Time Rate of Diffusion for Rate of Diffusion for 3 Crystals Rate of Diffusion for 6 Crystals (min) 1 Crystal (mm/hr) 0-10 90 0-20 48 0-30 36 (mm/hr) (mm/hr) Rate [mm/h] = (diameter [mm] / time [min]) x 60 [min] Xarrow_forwardGiven this frequency distribution, what demand values would be associated with the following random numbers? (Do not round intermediate calculations.) Demand Frequency 23 1 16 2 18 43 Random Number Simulated Demand 0.1 0.6 0.4arrow_forwardA premium golf ball production line must produce all of its balls to 1.615 ounces in order to get the top rating (and therefore the top dollar). Samples are drawn hourly and checked. If the production line gets out of sync with the target weight on a statistical significance test it must be shut down and repaired. Assume that the weight of golf balls is normally distributed. This hour’s sample of 18 balls has a mean of 1.611 ounces and a standard deviation of 0.065 ounces. This hour's sample mean falls -0.2600 standard errors below the mean. What is the exact p-value of this t statistic? (Enter your answer to 4-decimal places, for example 0.1000.)arrow_forward
- The K of a proportional controller is 30 and the reference value is 50% of the output. A valve is used at its outlet that, for the reference value, allows a flow of 2.0 m?/s. The valve changes its output in direct proportion to the controller output. What will be the controller output and deviation in error when the flow is to change to 2.5 m/s?arrow_forwardThe manager of the main laboratory facility at MetroHealth Center is interested in being able to predict the overhead costs each month for the lab. The manager that varies with the of lab performed but that some costs same each month of the lab tests performed. The lab manager collected the following data for the first seven months of the year. (Click the icon to view the data.) Read the requirements. Requirement 1. Prepare a scatter plot of the lab's volume (number of lab tests performed) and total laboratory overhead costs. Plot the points on the graph. (Enlarge the graph and use the point tool button displayed below to draw the graph.) Relationship of Total Laboratory Overhead Costs to Number of Lab Q Tests Performed Total Laboratory Overhead Co $36.000 $34.000- $32.000 $30,000 $28.000 $26.000 $24.000 $24,000 $22.000- $20,000- $18,000 $16.000 $14,000 $12,000 1,0001.7502 5003,2504,0004,750 Number of Lab Tests Performed Click to enlarge graph Data table Month January..... February....…arrow_forwardEach breakdown of a graphic plotter table atAirbus Industries costs $50. Find the expected daily breakdown cost, given the following data:arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,