The lease of Theme Park, Inc., is about to expire. Management must decide whether to renew the lease for another 10 years or to relocate near the site of a proposed motel. The town planning board is currently debating the merits of granting approval to the motel. A consultant has estimated the net present value of Theme Park's two alternatives under each state of nature as shown below. Suppose that the management of Theme Park, Inc., has decided that there is a 0.40 probability that the moteľ's application will be approved. Motel Motel Approved $ 600,000 2,500,000 Rejected $4,500,000 300,000 Options Renew Relocate а-1. If management uses maximum expected monetary value as the decision criterion, calculate expected monetary value for the alternatives "Renew" and "Relocate". Alternative Expected Value Renew Relocate
Q: What are 4 CAPACITY TECHNIQUES that can be used in short term?
A: A Small Introduction about Short-Term Short-term planning and scope organization, work change and a...
Q: Customers approach Florence’s Fortune Telling booth at a rate of 8 people/ hour. (Arrival rate follo...
A: Given data Clients approach to the organization at the rate of 8people per hour. Hence, Arrival ra...
Q: What is BCG Matrix? Please explain at your own words. Explain with one or two suitable examples.
A: A Small Introduction about Planning Planning includes choosing missions and objectives and the a...
Q: Angelina and Sophia attended a professional development retreat at Ferncliff Camp. They met at a dow...
A: Two girls Angelina and Sophia attended skillful or competent development retreats at the camp. After...
Q: a.What is Maxantene Products economic order quantity for this input? b. What is Maxantene Products'...
A: Economic order quantity is the optimal order quantity that any business should purchase so that thei...
Q: critically discuss benchmaking concept of the formulation and implementation of social policy
A: Transport planning can be stated as the approach of looking at the ongoing state of transportation i...
Q: A manager just received a new price list from a supplier. It will now cost $1.00 a box for order qua...
A: Economic order quantity helps companies to save cost. However, at times discounts are given by selle...
Q: Explain what is the pilot study and how could be processed, include some references if possible. Wha...
A: What is a Pilot Study, exactly? Ashley is a Ph.D. student who wanted to test if small group math gam...
Q: What obstacles to transferring resources to India and Brazil is Xiaomi likely to experience, and ho...
A: A Small Introduction about Supply Chain Management Supply Chain Management can be described as th...
Q: Asses the THREE (3) major categories of analytical reports and provide examples of each.
A: The 3 basic groups of analytical business depictions include the subsequent:
Q: The maintenance department in Ranchi Hospital uses 816 cases of liquid cleanser annually. Ordering c...
A: Many firms instead of employing a reorder quantity formula when restocking items make orders dependi...
Q: Describe the role of Presentations in Stakeholder Management and how Pecha Kucha can help you in Pro...
A: Project management is the use of specialized knowledge, skills, tools, and processes to give somethi...
Q: The following table shows the normal time, crash time, normal cost, and crash cost of an activity. W...
A: Given- Normal time Crash time Normal cost Crash cost 30 10 $150 $350
Q: Critically evaluate the relationship between corporate governance and enterpriserisk management and ...
A: A Small Introduction about Risk Management "Risk management" assists an association with distingu...
Q: How to find the areas of misalignment between risk appetite statement and the risk register (focusin...
A: Risk appetite refers to the amount of risk that an organization is willing to endure to achieve goal...
Q: Better Products (Assigning Plants to Products) The Better Products Company has decided to initiate t...
A: This is a transportation question in which decision needs to be made which plant will produce or shi...
Q: Sovenir Ltd. Does production of 2 lakhs units per month and the various inputs used by the company (...
A: Given: The Total Units Produced in a month = 2,00,000 Labour input (monthly) = 92000/12 = Rs. 7...
Q: Is Amazon Web Services an ERP system?
A: Enterprise resource planning is an umbrella term for a complicated type of business management softw...
Q: Select the process to which this situation can be related to, where The Project manager finds that t...
A: The project manager is the responsible person who takes care of the all reasonable steps necessary t...
Q: Is it important for companies to know the entire supply chain of the products they are selling or i...
A: The achievement of a manufacturing association is exceptionally subject to the accomplishment of the...
Q: 2. a. Develop a linear trend line for the following data. (Solve manually, using Minitab and using E...
A: Note: “Since you have posted a question with multiple sub-parts, we will solve the first three sub-p...
Q: 1. Draw a project network given the following information. 2. Complete the forward and backward pass...
A: Since you have posted a question with multiple sub-parts, we will solve the first three subparts for...
Q: A granite producer manufactures 92000 units of glass black granite slate in which the use of labour ...
A: Given:Units Produced=92,000labour input = Rs. 23,000Capital input = Rs. 15,009To be determined:The m...
Q: To connect with critical customers and suppliers, many large firms employ electronic data interchang...
A: EDI or Electronic Data Interchange is described as a technology that allows organizations and tradin...
Q: Describe closed-loop MRP
A: The closed-loop MRP framework also refers to the second-generation framework, like the Enterprise Re...
Q: . A manager wants to determine the number of containers to use for incoming parts for a kanban syste...
A: Given data, D Average Usage 80 pieces per hr T Cycle time 75 min 1.25 hrs X Inef...
Q: E-procurement is changing the B2B transactions by automating the purchasing process helping to deliv...
A: eProcurement was initiated in the 1980s when electronic data interchange (EDI) was designed. EDI per...
Q: how has covid19 impact air transportation in the USA
A: Covid 19 is one of the most dangerous pandemic the world has faced off ,the pandemic has almost affe...
Q: c. Complete the last three rows of the record by using the POQ lot-sizing rule, with P = 2. (Enter y...
A: Given data is
Q: Explain how you can improve the theoretical capacity of a process?
A: Theoretical capacity can be stated as the amount of throughput or production that could be obtained ...
Q: The sovereign debt crisis in the euro zone led to depreciation of the dollar against the euro and po...
A: The sovereign debt crisis in the euro zone was the reason because the European countries were unable...
Q: Daily Subway and Bus Use in Five Major C 0.75 0.5 0.25 gapore ez Kong ondon Tokyo v York
A: 1 b ) are unusually reliant on buses 2 c) it began to rebound after 1990
Q: The president of Hill Enterprises, Terri Hill, projects the firm's aggregate demand requirements ove...
A: Given-
Q: As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material fo...
A: The product structure is developed as follows:
Q: The structure of MRP systems suggests "buckets" and inliniteloading. What is meant by these two term...
A: A Material Requirements Planning often called MRP system can be stated as the planning and the decis...
Q: What is the rationale for (a) a phantom bill of material, (b) aplann ing bill of material, and (c) a...
A: In the construction, production, or maintenance of any product or service, a bill of materials (BOM)...
Q: For any industry to be successful, it has to be safe, reliable and sustainable in its operations. Th...
A: A hazard can be stated as something that can result in harm for example- working with electric instr...
Q: What is the estimated expected (mean) time for project completion?
A: A project network diagram is a visual representation of a project which identifying the activity rel...
Q: Master schedules a re expressed in three different waysdepending on whether the process is continuou...
A: Master scheduling refers to the detailed process of planning that help in tracking the manufacturing...
Q: ILLUSTRATION 6.5 War gaming in South Africa ILLUSTRATION Deloitte proposes war games to develop a st...
A: A business strategy is described as the combination of the various actions performed, decisions take...
Q: component of process quality is the value provided by the manufacturer / service provider in a timel...
A: Responsiveness is the component that makes the manufacturer or service provider work quickly and bri...
Q: In case of virtual value chain _____ is where an organization co-ordinates, measures and sometimes c...
A: The Virtual Value Chain is a business model that outlines the distribution of value-generating servi...
Q: What are the common and different features and approaches between manufacturing and service organiza...
A: A quality management system can be broadly defined as a system that would document processes, proced...
Q: You have a team of engineers working on your project. Two of the engineers have frequent disagreemen...
A: Workplace conflicts are described as the clash of interests, increased opposition, and disagreement ...
Q: Your Lego furniture company makes Tables and Chairs. Below, you are given the starting inventory, se...
A: T = Units of Tables to be produced C = Units of chairs to be produced Objective function: Max Z = 75...
Q: Using the information in Problem(The demand for subassembly Sis 100 units in week 7.Each unit ofS re...
A: Manufacturing activities management requires various offices to cooperate to deliver quality items a...
Q: What is the overall capacity of this system in units/hour? Question 12 What is the throughput time o...
A: Machine Productivity A 16 B 20 C 13 D 12 E 15 F 18 G 30 H 28
Q: An organization purchases the same component from three different suppliers viz V1, V2 and V3. This ...
A: Given data is
Q: Networks may be used to represent assignment problems. Discuss
A: An assignment problem can be stated as the particular type of problem associated with linear program...
Q: Identify the order in which a Project manager does his job a. Planning, Organizing, Controll...
A: A project manager is the responsible person for the whole project and is the person who makes proper...
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 3 images
- Scenario 3 Ben Gibson, the purchasing manager at Coastal Products, was reviewing purchasing expenditures for packaging materials with Jeff Joyner. Ben was particularly disturbed about the amount spent on corrugated boxes purchased from Southeastern Corrugated. Ben said, I dont like the salesman from that company. He comes around here acting like he owns the place. He loves to tell us about his fancy car, house, and vacations. It seems to me he must be making too much money off of us! Jeff responded that he heard Southeastern Corrugated was going to ask for a price increase to cover the rising costs of raw material paper stock. Jeff further stated that Southeastern would probably ask for more than what was justified simply from rising paper stock costs. After the meeting, Ben decided he had heard enough. After all, he prided himself on being a results-oriented manager. There was no way he was going to allow that salesman to keep taking advantage of Coastal Products. Ben called Jeff and told him it was time to rebid the corrugated contract before Southeastern came in with a price increase request. Who did Jeff know that might be interested in the business? Jeff replied he had several companies in mind to include in the bidding process. These companies would surely come in at a lower price, partly because they used lower-grade boxes that would probably work well enough in Coastal Products process. Jeff also explained that these suppliers were not serious contenders for the business. Their purpose was to create competition with the bids. Ben told Jeff to make sure that Southeastern was well aware that these new suppliers were bidding on the contract. He also said to make sure the suppliers knew that price was going to be the determining factor in this quote, because he considered corrugated boxes to be a standard industry item. Is Ben Gibson acting legally? Is he acting ethically? Why or why not?Scenario 3 Ben Gibson, the purchasing manager at Coastal Products, was reviewing purchasing expenditures for packaging materials with Jeff Joyner. Ben was particularly disturbed about the amount spent on corrugated boxes purchased from Southeastern Corrugated. Ben said, I dont like the salesman from that company. He comes around here acting like he owns the place. He loves to tell us about his fancy car, house, and vacations. It seems to me he must be making too much money off of us! Jeff responded that he heard Southeastern Corrugated was going to ask for a price increase to cover the rising costs of raw material paper stock. Jeff further stated that Southeastern would probably ask for more than what was justified simply from rising paper stock costs. After the meeting, Ben decided he had heard enough. After all, he prided himself on being a results-oriented manager. There was no way he was going to allow that salesman to keep taking advantage of Coastal Products. Ben called Jeff and told him it was time to rebid the corrugated contract before Southeastern came in with a price increase request. Who did Jeff know that might be interested in the business? Jeff replied he had several companies in mind to include in the bidding process. These companies would surely come in at a lower price, partly because they used lower-grade boxes that would probably work well enough in Coastal Products process. Jeff also explained that these suppliers were not serious contenders for the business. Their purpose was to create competition with the bids. Ben told Jeff to make sure that Southeastern was well aware that these new suppliers were bidding on the contract. He also said to make sure the suppliers knew that price was going to be the determining factor in this quote, because he considered corrugated boxes to be a standard industry item. As the Marketing Manager for Southeastern Corrugated, what would you do upon receiving the request for quotation from Coastal Products?Scenario 4 Sharon Gillespie, a new buyer at Visionex, Inc., was reviewing quotations for a tooling contract submitted by four suppliers. She was evaluating the quotes based on price, target quality levels, and delivery lead time promises. As she was working, her manager, Dave Cox, entered her office. He asked how everything was progressing and if she needed any help. She mentioned she was reviewing quotations from suppliers for a tooling contract. Dave asked who the interested suppliers were and if she had made a decision. Sharon indicated that one supplier, Apex, appeared to fit exactly the requirements Visionex had specified in the proposal. Dave told her to keep up the good work. Later that day Dave again visited Sharons office. He stated that he had done some research on the suppliers and felt that another supplier, Micron, appeared to have the best track record with Visionex. He pointed out that Sharons first choice was a new supplier to Visionex and there was some risk involved with that choice. Dave indicated that it would please him greatly if she selected Micron for the contract. The next day Sharon was having lunch with another buyer, Mark Smith. She mentioned the conversation with Dave and said she honestly felt that Apex was the best choice. When Mark asked Sharon who Dave preferred, she answered, Micron. At that point Mark rolled his eyes and shook his head. Sharon asked what the body language was all about. Mark replied, Look, I know youre new but you should know this. I heard last week that Daves brother-in-law is a new part owner of Micron. I was wondering how soon it would be before he started steering business to that company. He is not the straightest character. Sharon was shocked. After a few moments, she announced that her original choice was still the best selection. At that point Mark reminded Sharon that she was replacing a terminated buyer who did not go along with one of Daves previous preferred suppliers. What should Sharon do in this situation?
- Scenario 4 Sharon Gillespie, a new buyer at Visionex, Inc., was reviewing quotations for a tooling contract submitted by four suppliers. She was evaluating the quotes based on price, target quality levels, and delivery lead time promises. As she was working, her manager, Dave Cox, entered her office. He asked how everything was progressing and if she needed any help. She mentioned she was reviewing quotations from suppliers for a tooling contract. Dave asked who the interested suppliers were and if she had made a decision. Sharon indicated that one supplier, Apex, appeared to fit exactly the requirements Visionex had specified in the proposal. Dave told her to keep up the good work. Later that day Dave again visited Sharons office. He stated that he had done some research on the suppliers and felt that another supplier, Micron, appeared to have the best track record with Visionex. He pointed out that Sharons first choice was a new supplier to Visionex and there was some risk involved with that choice. Dave indicated that it would please him greatly if she selected Micron for the contract. The next day Sharon was having lunch with another buyer, Mark Smith. She mentioned the conversation with Dave and said she honestly felt that Apex was the best choice. When Mark asked Sharon who Dave preferred, she answered, Micron. At that point Mark rolled his eyes and shook his head. Sharon asked what the body language was all about. Mark replied, Look, I know youre new but you should know this. I heard last week that Daves brother-in-law is a new part owner of Micron. I was wondering how soon it would be before he started steering business to that company. He is not the straightest character. Sharon was shocked. After a few moments, she announced that her original choice was still the best selection. At that point Mark reminded Sharon that she was replacing a terminated buyer who did not go along with one of Daves previous preferred suppliers. Ethical decisions that affect a buyers ethical perspective usually involve the organizational environment, cultural environment, personal environment, and industry environment. Analyze this scenario using these four variables.Scenario 4 Sharon Gillespie, a new buyer at Visionex, Inc., was reviewing quotations for a tooling contract submitted by four suppliers. She was evaluating the quotes based on price, target quality levels, and delivery lead time promises. As she was working, her manager, Dave Cox, entered her office. He asked how everything was progressing and if she needed any help. She mentioned she was reviewing quotations from suppliers for a tooling contract. Dave asked who the interested suppliers were and if she had made a decision. Sharon indicated that one supplier, Apex, appeared to fit exactly the requirements Visionex had specified in the proposal. Dave told her to keep up the good work. Later that day Dave again visited Sharons office. He stated that he had done some research on the suppliers and felt that another supplier, Micron, appeared to have the best track record with Visionex. He pointed out that Sharons first choice was a new supplier to Visionex and there was some risk involved with that choice. Dave indicated that it would please him greatly if she selected Micron for the contract. The next day Sharon was having lunch with another buyer, Mark Smith. She mentioned the conversation with Dave and said she honestly felt that Apex was the best choice. When Mark asked Sharon who Dave preferred, she answered, Micron. At that point Mark rolled his eyes and shook his head. Sharon asked what the body language was all about. Mark replied, Look, I know youre new but you should know this. I heard last week that Daves brother-in-law is a new part owner of Micron. I was wondering how soon it would be before he started steering business to that company. He is not the straightest character. Sharon was shocked. After a few moments, she announced that her original choice was still the best selection. At that point Mark reminded Sharon that she was replacing a terminated buyer who did not go along with one of Daves previous preferred suppliers. What does the Institute of Supply Management code of ethics say about financial conflicts of interest?The Tinkan Company produces one-pound cans for the Canadian salmon industry. Each year the salmon spawn during a 24-hour period and must be canned immediately. Tinkan has the following agreement with the salmon industry. The company can deliver as many cans as it chooses. Then the salmon are caught. For each can by which Tinkan falls short of the salmon industrys needs, the company pays the industry a 2 penalty. Cans cost Tinkan 1 to produce and are sold by Tinkan for 2 per can. If any cans are left over, they are returned to Tinkan and the company reimburses the industry 2 for each extra can. These extra cans are put in storage for next year. Each year a can is held in storage, a carrying cost equal to 20% of the cans production cost is incurred. It is well known that the number of salmon harvested during a year is strongly related to the number of salmon harvested the previous year. In fact, using past data, Tinkan estimates that the harvest size in year t, Ht (measured in the number of cans required), is related to the harvest size in the previous year, Ht1, by the equation Ht = Ht1et where et is normally distributed with mean 1.02 and standard deviation 0.10. Tinkan plans to use the following production strategy. For some value of x, it produces enough cans at the beginning of year t to bring its inventory up to x+Ht, where Ht is the predicted harvest size in year t. Then it delivers these cans to the salmon industry. For example, if it uses x = 100,000, the predicted harvest size is 500,000 cans, and 80,000 cans are already in inventory, then Tinkan produces and delivers 520,000 cans. Given that the harvest size for the previous year was 550,000 cans, use simulation to help Tinkan develop a production strategy that maximizes its expected profit over the next 20 years. Assume that the company begins year 1 with an initial inventory of 300,000 cans.
- Alternative Alternative 1 Alternative 2 Alternative 3 State of Nature Outcome 1 ($) 800 500 700 0.62 Probability according to the payoff table? OEMV (Alternative 1) = $900 EMV (Alternative 3) is the highest EMV EMV (Alternative 2) = EMV (Alternative 3) EMV (Alternative 1) is the highest EMV Outcome 2 ($) 1000 1200 900 0.38 Which of the following statements is correctSuppose that the management of Theme Park, Inc., has decided that there is a.35 probability that the motel’s application will be approved.a. If management uses maximum expected monetary value as the decision criterion, which alternative should it choose?b. Represent this problem in the form of a decision tree.c. If management has been offered the option of a temporary lease while the town planning boardconsiders the motel’s application, would you advise management to sign the lease? The leasewill cost $24,000.A manager is trying to decide whether to build a small,medium, or large facility. Demand can be low, average,or high, with the estimated probabilities being 0.25, 0.40,and 0.35, respectively.A small facility is expected to earn an after-tax net pres-ent value of just $18,000 if demand is low. If demand isaverage, the small facility is expected to earn $75,000; it canbe increased to medium size to earn a net present value of$60,000. If demand is high, the small facility is expected to earn $75,000 and can be expanded to medium size to earn$60,000 or to large size to earn $125,000.A medium-sized facility is expected to lose an estimated$25,000 if demand is low and earn $140,000 if demand isaverage. If demand is high, the medium-sized facility isexpected to earn a net present value of $150,000; it can beexpanded to a large size for a net payoff of $145,000.If a large facility is built and demand is high, earningsare expected to be $220,000. If demand is average for thelarge facility, the…
- Civil engineering consulting fi rms that provide ser-vices to outlying communities are vulnerable to a number of factors that affect the fi nancial conditionof the communities, such as bond issues and real estate developments. A small consulting fi rm en-tered into a fi xed-price contract with a large devel-oper, resulting in a stable income of $260,000 per year in years 1 through 3. At the end of that time, a mild recession slowed the development, so the par-ties signed another contract for $190,000 per year for 2 more years. Determine the present worth of thetwo contracts at an interest rate of 10% per year.A firm must decide whether to construct a small, medium, or large stamping plant. A consultant’sreport indicates a .20 probability that demand will be low and an .80 probability that demand willbe high.If the firm builds a small facility and demand turns out to be low, the net present value will be$42 million. If demand turns out to be high, the firm can either subcontract and realize the net present value of $42 million or expand greatly for a net present value of $48 million.The firm could build a medium-size facility as a hedge: If demand turns out to be low, its netpresent value is estimated at $22 million; if demand turns out to be high, the firm could do nothingand realize a net present value of $46 million, or it could expand and realize a net present value of$50 million.If the firm builds a large facility and demand is low, the net present value will be – $20 million,whereas high demand will result in a net present value of $72 million.a. Analyze this problem using a decision…A firm must decide whether to construct a small, medium, or large stamping plant. A consultant’s report indicates a 0.20 probability that demand will be low and a 0.80 probability that demand will be high. If the firms builds a small facility and demand turns out to be low, the net present value will be $42 million. If demand turns out to be high, the firm can either subcontract and realize the net present value of S$42 million or expand greatly for a net present value of $48 million. The firm could build a medium size facility as a hedge: if demand turns out to be low, its net present value is estimated at $22 million; if demand turns out to be high, the firm could do nothing and realize a net present value of $46 million, or it could expand and realize a net present value of $50 million. If the firm builds a large facility and demand is low, the net present value will be -$20 million, whereas high demand will result in a net present value of $72 million. Analyze and prepare a…