Problem 2 Below is information related to: historical average processing times for Products A and B • historical percentage of work center load required to produce Produdcts A and B • routing and standard times to produce Product B • the product structure for Product B • a MPS covering 3 periods for Products A and B. MPS in Units End Product 1 2 Processing Time Historical % End Product Hours/Unit A 50 45 25 wc 30 25 30 100 40% A 0.80 200 50% в 1.6 300 10% Routing and Standard Time Data End Product Lot Size Work Center Set Up (Hrs) Run Time/Unit (Hrs) Hrs/Unit B 40 100 1. 1.25 (3 required) D 50 200 0.07 100 200 2 0.08 100 300 2 0.04 (2 required) B. Create a capacity bill for product B in the space provided. Consider lot sizes in your calculations. Capacity Bill for Product B EF

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question
Problem 2
Below is information related to:
historical average processing times for Products A and B
• historical percentage of work center load required to produce Produdcts A and B
• routing and standard times to produce Product B
• the product structure for Product B
• a MPS covering 3 periods for Products A and B.
MPS in Units
End Product
1
2
Processing Time
Historical % End Product Hours/Unit
A
50
45
25
wc
30
25
30
100
40%
A
0.80
200
50%
в
1.6
300
10%
Routing and Standard Time Data
End Product Lot Size Work Center Set Up (Hrs) Run Time/Unit (Hrs) Hrs/Unit
B
40
100
1.
1.25
(3 required)
D
50
200
0.07
100
200
2
0.08
100
300
2
0.04
(2 required)
B. Create a capacity bill for product B in the space provided. Consider lot sizes in your
calculations.
Capacity Bill for Product B
EF
Transcribed Image Text:Problem 2 Below is information related to: historical average processing times for Products A and B • historical percentage of work center load required to produce Produdcts A and B • routing and standard times to produce Product B • the product structure for Product B • a MPS covering 3 periods for Products A and B. MPS in Units End Product 1 2 Processing Time Historical % End Product Hours/Unit A 50 45 25 wc 30 25 30 100 40% A 0.80 200 50% в 1.6 300 10% Routing and Standard Time Data End Product Lot Size Work Center Set Up (Hrs) Run Time/Unit (Hrs) Hrs/Unit B 40 100 1. 1.25 (3 required) D 50 200 0.07 100 200 2 0.08 100 300 2 0.04 (2 required) B. Create a capacity bill for product B in the space provided. Consider lot sizes in your calculations. Capacity Bill for Product B EF
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,