The average normal flow of traffic on
cross roads A and B during design
period are 400 and 250 pcu per hour; the
saturations flow values on these roads
are estimated as 1250 and 1000 pcu per
hour respectively.
The all-red time required for pedestrian
crossing is 12 secs.
Design two phase traffic signal by
Webster's method.
Q3c. At a three leg (T) intersection, the two-way peak hour volume on the minor road is 500 veh/hr and that on the major road is 600 veh/hr. As a Traffic Engineer, what type of intersection control will you propose? What is the basis of your proposal?
A Four Lane freeway is located on rolling terrain with a free flow speed of 70 mph,12ft lanes, and no lateral obstructions within 8 ft of the pavement edges. the traffic stream consists of cars, buses and large trucks (no recreational vehicles) . A weekend directional peak hour volume of 1800 vehicles (*regular users*)is observed ,with 700 arriving in the mostly congested 15 minutes period . if a level of service no worse than C is required ,determine the maximum number of large trucks and buses that can be present in the peak hour traffic stream..
Dislike for wrong answers
Chapter 8 Solutions
Traffic and Highway Engineering
Ch. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10P
Ch. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28P
Knowledge Booster
Similar questions
- Two adjacent signalized intersections along a major arterial are 650 ft apart (stop line to stop line distance). If the space mean speed between these two intersections is 22 mph, what should be the signal offset of the downstream intersection relative to the upstream intersection? Group of answer choices 20.0 sec 13.5 sec 40.0 sec 29.5 secarrow_forwardDraw the intersection diagram for a given traffic volume summary of a T intersection and design the most appropriate and logical phasing pattern for the unsignalized intersection.arrow_forwardA six-lane freeway (three lanes in each direction) in mountainous terrain has 10-ft lanes and obstructions 1 ft from the right edge. There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. The traffic stream consists of mostly commuters with a peak hour factor of 0.84, peak-hour volume of 2500 vehicles, and 4% recreational vehicles. What is the level of service? (Write the letter only)arrow_forward
- A new freeway ramp meter will be installed on the Medina onramp to westbound SR 520. There is 70 ft from the ramp meter stop line back to the nearest intersection, and each stopped vehicle takes up an average of 20 ft. The desired meter rate is one vehicle every 10 seconds, while the arrival rate averages one vehicle arrival every 11 seconds. What is the average queue length? 55ft O 4.5 ft 100ft 90ftarrow_forward3. Determine the LOS for pedestrians at two-phase signalised intersection with a cycle length of 90 s. the phase serving the major street vehicular traffic gets 50s of green whereas the phase serving the minor street vehicular traffic gets 30 s of green. Useful formula: dp Table for assessing the LOS LOS A B C D E F 0.5(C-g)² C Average delay/pedestrian (s) >5 ≥ 5-10 > 10-20 >20-30 ≥ 30-45 > 45arrow_forwardDraw a space – time diagram for traffic within a tunnel. Assuming there exist a 2-lane before the tunnel but the tunnel itself is 1-lane and after the tunnel the road returns to being a 2-lane.arrow_forward
- Analyze the unsignalized intersection below and calculate the optimum cycle length if the intersection will be signalized. Approach E W N S Maximum no. of lanes 5 5 4 4 Direction Through left Through left Through left Through left N Total volume pcu/hr 1,480 370 860 586 1,360 494 2,030 265 Sat. flow rate pcu/hr/lane 2,400 1,700 2,400 1,700 2,200 1,800 2,200 1,800arrow_forwardIna road-intersection near Dhaka, average 120 cars make right-hand turns in every hour. Road planner wants to put in a 3-vehicle right- hand turn lane in the intersection to avoid blocking of thru traffic. Determine if 3-vehicle right-hand turn lane satisfy the following design criteria: Red light time of right-hand traffic is 30 seconds Right-hand turn lane must be sufficient 90% of the time.arrow_forwardIn order to determine the DHV from a traffic count worksheet, the first step is to: Group of answer choices Calculate the PHF of each approach Determine which hour has the highest total intersection volume in veh/hr Convert all of the turning counts from veh/15-min to veh/hr Calculate the PHF of the intersectionarrow_forward
- A developer has applied for a construction permit to build a supermarket at the southeast cornerof an intersection that is formed by a four-lane divided highway in the east-west direction and atwo-lane road in the north-south direction. Traffic on the two-lane road is controlled by a stop signat the intersection. The speed limit on the four-lane highway is 88 km/h. using the sight trianglerequirements at the intersection (Case B1), determine whether permission should be given for theconstruction if the following conditions exist. Provide a diagram for your solution.Major road lane width = 3.6 mMinor road lane width = 3.3 mMedian lane = 2.8 mDesign vehicle is a passenger carApproach grade = 2%Maximum feasible distance building from the center of the nearest lane of four-lane road = 5.4 mMaximum feasible distance building from the center of the nearest lane of two-lane road = 16.5 marrow_forwardFour-phases signal with a cycle time of 80 sec, Inter Green = 4 sec/phase, lost time / phase = 2 sec. Saturation flow on all approaches are similar, but the maximum traffic flows on two of the phases are triple the maximum traffic flows on the remaining two approaches, what will be actual green time on each phase ?arrow_forwardramps within 3 miles upstream and downstream of the segment midpoint. It is on rolling terrain with 10% heavy vehicles and is operating at capacity with a peak-hour factor of 0.9. If the road is expanded to four 11-foot lanes with a 2-foot right shoulder, and traffic after the expansion is projected to increase by 10% with the same heavy vehicle percentage and peak-hour factor, what is the new LOS and estimated density? P-22 Chapter 6 Problems hour. What would be the LOS before and after the heavy vehicles are allowed on the upgrade (assuming 50% SUTs and 50% TTs.)? 6.21 A multilane highway has four lanes (two lanes in each direction) and a measured FFS of 55 mi/h. The directional peak-hour volume is 1900 vehicles (the peak-hour factor is 0.80). One upgrade is 5% and is 0.62 mi long. Currently, heavy vehicles are not permitted on the highway, but local authorities are considering allowing heavy vehicles on this upgrade. If this is done, they estimate that 150 heavy vehicles will use…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning