Principles Of Operations Management
11th Edition
ISBN: 9780135173930
Author: RENDER, Barry, HEIZER, Jay, Munson, Chuck
Publisher: Pearson,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7.S, Problem 28P
a)
Summary Introduction
To determine: The break-even point in units for Proposal X.
b)
Summary Introduction
To determine: The break-even point in units for Proposal Y.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Wolfgang Kersten Mfg. intends to increase capacitythrough the addition of new equipment. Two vendors havepresented proposals. The fixed costs for proposal X are $150,000,and for proposal Y, Sl70,000. The variable cost for X is $120.00,and for Y, $100.00. The revenue generated by each unit is $200.00.a) What is the break-even point in units for proposal X?b) What is the break-even point in units for proposal Y?
Markland Manufacturing intends to increase capacity by overcoming a bottleneck operation byadding new equipment. Two vendors have presented proposals. The fixed costs for proposal A are$50,000, and for proposal B, $70,000. The variable cost for A is $12.00, and for B, $10.00. The revenuegenerated by each unit is $20.00.a) What is the break-even point in units for proposal A?b) What is the break-even point in units for proposal B?
Stapleton Manufacturing intends to increase capac-ity through the addition of new equipment. Two vendors have
presented proposals. The fixed cost for proposal A is $65,000, andfor proposal B, $34,000. The variable cost for A is $10, and for B,$14. The revenue generated by each unit is $18.
a) What is the crossover point in units for the two options?b) At an expected volume of 8,300 units, which alternative shouldbe chosen?
Chapter 7 Solutions
Principles Of Operations Management
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 28PCh. 7.S - Prob. 29PCh. 7.S - Prob. 30PCh. 7.S - Prob. 31PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 40PCh. 7.S - Prob. 41PCh. 7.S - Prob. 42PCh. 7.S - Prob. 43PCh. 7.S - Prob. 44PCh. 7.S - Prob. 45PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Sroufe Manufacturing intends to increase capacityby overcoming a bottleneck operation by adding new equipment.Two vendors have presented proposals. The fixed costs for proposalA are $50,000, and for proposal B, $70,000. The va riablecost for A is $12.00, and fo r B, $10.00. The revenue generated byeach unit is $20.00.a) What is the break-even point in units for proposal A?b) What is the break-even point in units for proposal B?arrow_forwardSroufe Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs are $50,000 for proposal A and $70,000 for proposal B. The variable cost is $14.00 for A and $11.00 for B. The revenue generated by each unit is $20.00. a) The break-even point in units for the proposal by Vendor A =units (round your response to the nearest whole number). b) The break-even point in units for the proposal by Vendor B =units (round your response to the nearest whole number).arrow_forwardCortez Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs are $50,000 for proposal A and $75,000 for proposal B. In addition to the proposed fixed costs from the two ve management at Cortez anticipates that they will have to spend $8,000 for installations be completed. The variable cost is $12.00 for A and $11.00 for B. The revenue generated by each unit is $24.00. a) The break-even point in dollars for the proposal by Vendor A = $ (round your response to the nearest whole number). b) The break-even point in dollars for the proposal by Vendor B = $| (round your response to the nearest whole number).arrow_forward
- Markland Manufacturing intends to increase capac-ity by overcoming a bottleneck operation by adding new equip-ment. Two vendors have presented proposals. The fixed costs for proposal A are $50,000, and for proposal B, $70,000. The variablecost for A is $12.00, and for B, $10.00. The revenue generated byeach unit is $20.00.a) What is the break-even point in units for proposal A?b) What is the break-even point in units for proposal B?arrow_forwardPreliminary plans are underway for construction of a new stadium for a major league baseball team. City officials question the number and profitability of the luxury corporate boxes planned for the upper deck of the stadium. Corporations and selected individuals may purchase a box for $300,000. The fixed construction cost for the upper-deck area is estimated to be $4,500,000, with a variable cost of $150,000 for each box constructed. a. What is the breakeven point for the number of luxury boxes in the new stadium? b. Preliminary drawings for the stadium show that space is available for the construction of up to 50 luxury boxes. Promoters indicate that buyers are available and that all 50 could be sold if constructed. What is your recommendation concerning the construction of luxury boxes? What profit is anticipated?arrow_forwardWalton, Inc. is unsure whether to sell its product assembled or unassembled. The unit cost of the unassembled product is $32, while the cost of assembling each unit is estimated at $34. Unassembled units can be sold for $110, while assembled units could be sold for $142 per unit. What decision should Walton make?arrow_forward
- INSTRUCTIONS: We're looking to work with a new publisher that is interested in selling us two different placements. The publisher has told us that placement 1 has an approximate CTR of 0.3% and will get 2M impressions per month. Placement 2 has an approximate CTR of 0.4% and will get 3M impressions. The CPM for Placement 1 is $5, CPM for Placement 2 is 6$ The conversion rate of our landing page is 8% and the leads generated all are worth $50. Please use the worksheet outlined below to fill in the highlighted cells with the answers you find. 1. What is the total cost? 2. What is the total revenue and retutn on ad spend? 3. What is the total clickthrough rate (CTR)? 4. Which placement is more effective in terms of ROAS? Placement 1 Placement 2 Total Impressions 2,000,000 3,000,000 CTR 0.30% 0.40% CR 8.00% 8.00% Clicks Leads = Impressions * CTR = Clicks * CR Revenue = Leads RPL DEFINITIONS: Revenue: Money generated from leads submitted by visitors filling out forms. Impressions: The…arrow_forwardStapleton Manufacturing intends to increase capacity through the addition of new equipment. Two vendors have presented proposals. The fixed cost for proposal A is $65,000, and for proposal B, $34,000. The variable cost for A is $10, and for B, $14. The revenue generated by each unit is $18.a) What is the crossover point in units for the two o ptions?b) At an expected volume of8,300 units, which alternative shouldbe chosen?arrow_forward"I'm not sure we should lay out $265,000 for that automated welding machine," said Jim Alder, president of the Superior Equipment Company. "That's a lot of money, and it would cost us $78,000 for software and installation, and another $40,800 per year just to maintain the thing. In addition, the manufacturer admits it would cost $41,000 more at the end of three years to replace worn-out parts." "I admit it's a lot of money," said Franci Rogers, the controller. “But you know the turnover problem we’ve had with the welding crew. This machine would replace six welders at a cost savings of $108,000 per year. And we would save another $6,900 per year in reduced material waste. When you figure that the automated welder would last for six years, I'm sure the return would be greater than our 19% required rate of return." "I'm still not convinced," countered Mr. Alder. "We can only get $14,000 scrap value out of our old welding equipment if we sell it now, and in six years the new machine will…arrow_forward
- 4 - Smithson Cutting is opening a new line of scissors for supermarket distribution. It estimates its fixedcost to be $500.00 and its variable cost to be $0.50 per unit. Selling price is expected to average $0.75per unit.a) What is Smithson’s break-even point in units?b) What is the break-even point in dollars?arrow_forwardStapleton Manufacturing intends to increase capacity through the addition of new equipment. Two vendors have presented proposals. The fixed cost for proposal A is $55,000, and for proposal B, $33,000. The variable cost for A is $9, and for B, $14. The revenue generated by each unit is $18. a) What is the crossover point for the two options? The crossover point for the two options is units. (Round your response to the nearest whole number.) b) At an expected volume of 6,200 units, which alternative should be chosen? The profit (loss) if proposal A is accepted and 6,200 units are produced is $ (Round your response to the nearest dollar and include a minus sign if necessary.) The profit (loss) if proposal B is accepted and 6,200 units are produced is $ (Round your response to the nearest dollar and include a minus sign if necessary.) should be chosen at an expected volume of 6,200 units.arrow_forwardAlex owns a shop that sells customized BMX bikes. Each one is uniquely tailored to the rider. The products are unique one-offs, made by an outsourced company to individual designs agreed between Alex and a designer from the outsourced company. In WEEK 26, Alex discusses with the manufacturer a design for a new bike. Alex and the manufacturer agree on a specification and an order is placed with the manufacturer. A. Calculate how long it will take before the BMX bike is available for sale in Alex's shop. That is, what is the Lead-Time between Alex placing order with her manufacturer and being able to display the item for sale in her shop? The information you need to calculate the Lead-Time is as follows: To design the bike 2 weeks To raise the order for the parts for the bike 1week To manufacture and deliver all the parts of the bike 4 weeks To assemble the bike 2 weeks To deliver the finished product to Alex’s shop 1 week B. What will be the week number when the Bike can be…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY