Operations Management
13th Edition
ISBN: 9781259667473
Author: William J Stevenson
Publisher: McGraw-Hill Education
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 6, Problem 9P
Arrange six departments into a 2 × 3 grid so that these conditions are satisfied. 1 close to 2, 5 close to 2 and 6, 2 close to 5, and 3 not close to 1 or 2.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Arrange six departments into a 2 × 3 grid so that these conditions are satisfied: 1 close to 2, 5 close to 2 and 6, 2 close to 5, and 3 not close to 1 or 2.
MGT-314 (Operation management) MCQ:
1. Mamar daan halim is one of the best halim in Bangladesh. They have a food stand in Banasree. Mama the owner makes a bowl every morning. Brings that to the spot and sells it to his customers. What kind of facility layout is this?
a) Mass Processing
b) Batch Processing
c) Continuous processing
d) Job Shop
02. Dunder Mifflin is looking to sell its products on the international market, what quality mark will help it improve its image?
a) ISO 21000
b)ISO 9000
c) BSTI 1500
d)ISO 14000
3.4-15. The Weigelt Corporation has three branch plants with ex-
cess production capacity. Fortunately, the corporation has a new
product ready to begin production, and all three plants have this
capability, so some of the excess capacity can be used in this way.
This product can be made in three sizes-large, medium, and
Chapter 6 Solutions
Operations Management
Ch. 6.2 - MORTON SALT Introduction Morton Salt is a...Ch. 6.2 - MORTON SALT Introduction Morton Salt is a...Ch. 6.2 - MORTON SALT Introduction Morton Salt is a...Ch. 6.2 - MORTON SALT Introduction Morton Salt is a...Ch. 6.2 - MORTON SALT Introduction Morton Salt is a...Ch. 6.2 - MORTON SALT Introduction Morton Salt is a...Ch. 6.3 - FOXCONN SHIFTS ITS FOCUS TO AUTOMATION Foxconn...Ch. 6.3 - FOXCONN SHIFTS ITS FOCUS TO AUTOMATION Foxconn...Ch. 6.3 - Prob. 2.1RQCh. 6.3 - Prob. 2.2RQ
Ch. 6.5 - Prob. 1.1RQCh. 6.5 - Prob. 1.2RQCh. 6 - Explain the importance of process selection in...Ch. 6 - Briefly describe the five process types, and...Ch. 6 - Prob. 3DRQCh. 6 - Briefly describe computer-assisted approaches to...Ch. 6 - What is a flexible manufacturing system, and under...Ch. 6 - Prob. 6DRQCh. 6 - Why might the choice of equipment that provides...Ch. 6 - Prob. 8DRQCh. 6 - Prob. 9DRQCh. 6 - Briefly describe the two main layout types.Ch. 6 - Prob. 11DRQCh. 6 - Prob. 12DRQCh. 6 - What is the goal of Line balancing? What happens...Ch. 6 - Why are routing and scheduling continual problems...Ch. 6 - Prob. 15DRQCh. 6 - Prob. 16DRQCh. 6 - The City Transportation Planning Committee must...Ch. 6 - Identify the fixed-path and variable-path...Ch. 6 - Prob. 19DRQCh. 6 - Prob. 20DRQCh. 6 - Prob. 21DRQCh. 6 - Prob. 22DRQCh. 6 - What is cellular manufacturing? What are its main...Ch. 6 - Prob. 24DRQCh. 6 - Prob. 25DRQCh. 6 - Prob. 1TSCh. 6 - What trade-offs are involved when deciding how...Ch. 6 - Who needs to be involved in process selection?Ch. 6 - Prob. 4TSCh. 6 - Prob. 5TSCh. 6 - Prob. 1CTECh. 6 - Prob. 2CTECh. 6 - What are the risks of automating a production...Ch. 6 - Consider an assembly line such as the burrito...Ch. 6 - Prob. 1PCh. 6 - A manager wants to assign tasks to workstations as...Ch. 6 - A manager wants to assign tasks to workstations as...Ch. 6 - A producer of inkjet printer is planning to add a...Ch. 6 - As part of a major plant renovation project, the...Ch. 6 - Twelve tasks, with times and precedence...Ch. 6 - For the given set of tasks, do the following: a....Ch. 6 - A shop works a 400-minute day. The manager of the...Ch. 6 - Arrange six departments into a 2 3 grid so that...Ch. 6 - Using the information given in the preceding...Ch. 6 - Using the information in the following grid,...Ch. 6 - Arrange the eight departments shown in the...Ch. 6 - Arrange the departments so they satisfy the...Ch. 6 - a. Determine the placement of departments fix a...Ch. 6 - Prob. 15PCh. 6 - Develop a process layout that will minimize the...Ch. 6 - Prob. 17PCh. 6 - Rebalance the assembly line in Problem 7. This...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Amy Xia’s plant was designed to produce7,000 hammers per day but is limited to making 6,000 hammersper day because of the time needed to change equipment betweenstyles of hammers. What is the utilization?arrow_forwardArrange the eight departments shown in the accompanying Muther grid into a 2 × 4 format. Note: Department 1 must be in the location shown.arrow_forward1. Aljon, a softdrink dealer, delivers 14 cases on Monday, 10 cases on Tuesday, 12 cases on Wednesday, 15 cases on Thursday, 19 cases on Friday, and 20 cases on Saturday. How many cases are delivered on the average each day?arrow_forward
- A manager must decide which type of machine to buy, A, B, or C. Machines costs are as follows: Machine Cost A $40,000 B $30,000 C $80,000 Product forecast, processing times on the machines, and setup times are as follows: Processing Time Per Unit (minutes) Product Annual Demand A B C Setup Times (minutes) Production Lots (units) 1 16,000 3 4 2 20 200 2 12,000 4 5 3 35 100 3 6,000 5 6 3 60 50 4 30,000 2 4 1 15 500 Machines operate 10 hours a day, 250 days a year. The manager wants to have a capacity cushion of 10%. a. Assume that only purchasing costs are being considered. Which machines would have the lowest total cost, and how many of that machines would be needed? b. Consider this additional information: The machines differ in terms of hourly operating costs: The A machines have an hourly operating cost of $11 each, B machines have an hourly operating cost of $10 each, and C machines have an hourly operating cost of $12 each. Which alternative would…arrow_forwardFor the four basic configurations that follow, assume that the market is demanding product that must be processed by both Resource X and Resource Y for Cases I, II, and III. For Case IV, both resources supply separate but dependent markets; that is, the number of units of output from both X and Y must be equal. Plans are being made to produce a product that requires 40 minutes on Resource X and 30 minutes on Resource Y. Assume that there is only one of each of these resources and that market demand is 1,500 units per month. The only one I got right was B Case I :(arrow_forwardplease solve D only (a) What is the cycle time necessary to achieve the desired rate of production? =12min(b) Using the longest element rule, create workstations to balance the line,attempting to get as close as possible to the theoretical minimum numberof workstations.(c) What is the efficiency and idle time of the line balance? =72.22%(d) The company considers that if the lamps are successful with the publicit may need to increase production to 30,000 units. The company thinksthe simplest solution is to obtain two more production lines, thus havingtriple capacity. Another option is to re-balance the line. Considering thata single worker is assigned to a work station, determine which option(more production lines or re-balancing) yields the smallest labour size.arrow_forward
- If a plant has an effective capacity of 6,400 and an efficiency of 88%, then its actual (planned) output =_______units (enter your response as a whole number).arrow_forwarder A product line includes 8 different product styles, each consisting of 93 components. Assume that 9 processing operations are needed to produce each component on average with each operation taking an average 1.2 min, which includes setup time and part handling time. All operations need a production machine, and currently 25 machines are dedicated to this task. The plant operates 52 hours per week, 52 weeks a year. Determine the yearly production of each style in units (round downward). 63 504arrow_forwardA. Which machine would is constraint in the plant? B. Which product mix provides highest gross profit? Product M= ______ units Product N=_______units C. What is the maximum weekly net profit this plant can earn using the product mix from Part b?arrow_forward
- A product line manufacturing shoes has five stations in series whose individual capacities per shift are stated in the following table: the actual output of the line is 500 pairs per shift. Find 1. The system capacity? 2. The system efficiency? Station no 1 2 3 4 5 Individual capacity shift 600 650 650 550 600arrow_forwardThe three-station work cell at Puman Mng. Inc s ustrated in the figure below Rhas ho machines at staton 1in paralel the product needs to go through only one of the two machines before proceeding to station 2) 30 minunit Stadon 1 Machine A Staton 2 Staton 3 Staton Machine e 10 mnunit 3 minunt 30 munt The throughout tine isminutes enter your respone asahoie umber D The botteneck ime of this work cel is minutes per unt enter your response asnole umber) is the bottieneck station d) f the firm operates 11 hours per day 6 days per week the weey capacity of this work cel is unts (enter your maponse asa whole numbedarrow_forwardTerm that describes when multiple (usually similar) products can be produced in a facility less expensively than a single product.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY