TRUE OR FALSE The objective function may be expressed as an equation or as an inequality
Q: Find the maximum and minimum values of the function Z = 8X1 + 5X2, subject to the following: 3X1 –…
A: The value of the objective function at each of these extreme points is as follows: Extreme…
Q: Describe the analysis of simultaneous changes in coefficients of objective function??
A: Analyzing Simultaneous Changes in Objective Function Coefficients is a method for analysing…
Q: Explain the process of analyzing simultaneous changes in objective function coefficients
A: Analysis of Simultaneous Changes in Selected Control Coefficients- The optimal answer will remain…
Q: TRUE OR FALSE Each constraint excluding nonnegativity constraints, in the mathematical formulation…
A: The simplex table is utilized to perform row operations on the LP model just as for actually looking…
Q: The aim of the objective function for Chris Beehner Company should be to the objective value.…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: What is meant by parametric linear programming
A: Linear programming technique that is used to maximize profit while minimizing cost. For cost…
Q: An optimal solution requires that all artificial variables are O there are no special requirements…
A: Optimal solution indicating the point which the objective function reach the maximum. An artificial…
Q: You have been assigned to develop a model that can be used to schedule employees at a local…
A: Any model/graphical representation/diagrammatic representation is based on data. This data is…
Q: The political pollster Canter is preparing for a national election. It would like to poll at least…
A: Given Information:
Q: TRUE OR FALSE An optimal solution to a linear programming problem always occurs at the intersection…
A: An optimal solution to a linear programming problem is the feasible solution with the largest…
Q: all the limited resources available.
A: The best option for a business to solve a problem or accomplish its goals is referred to as an…
Q: Which of the following is not one of the reasons an optimization model can become nonlinear? Group…
A: The optimization model has three elements which are decision variables, objective function, and…
Q: What happens when the slope of the objective function is the same as the slope of one of the…
A: But only if there are fewer than 2 variables is it possible to perform a graphical analysis with…
Q: The aim of the objective function for Attaran Corporation should be to Maximize the objective value.…
A: Let number of portable Air conditioners manufactured be x and number of portable heaters…
Q: In robust optimization, what is meant by the term "hard constraint"?
A: There are two types of constraints soft constraint and hard constraint. Robust optimization relates…
Q: n using Excel to solve linear programming problems, the objective cell represents the a. value…
A: The objective function is a numerical equation that represents the manufacturing output target that…
Q: Heller Manufacturing has two production facilities that manufacture baseball gloves. Production…
A: Given data: TCD(X) = X2-X+3 TCH(Y)=Y2+2Y+2 5000 gloves per week production
Q: Explain what is meant by a linear programming that has feasible region with infinite number of…
A: A feasible area is a solution space for an optimization problem that comprises all potential points.…
Q: These are Hiwot and Durex. Hiwot requires 9 minutes to assemble and 2 minutes to package. While…
A: Let, x1 be the number of units of Hiwot tractors x2 be the number of units of Durex tractors
Q: TRUE OR FALSE In a simplex maximization slack variable is added to convert the objective function…
A: Slack variables are added to convert the objective function to the equation.
Q: TRUE OR FALSE In the simplex minimization method, optimality is signaled by the presence of all…
A: In the optimal simplex table, cj-zj=0 value indicates an Alternative solution
Q: Maximize the objective function 4x + 4y subject to the constraints. X + 2y < 28 3x + 2y 2 36 X20,…
A: Hi, we are supposed to answer one question at a time. Since you have not mentioned which question to…
Q: Write in normal form and solve by the simplex method, assuming x, to be nonnegative. 1. The owner of…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: The condition of nonnegativity requires that: a. the objective function cannot be less than zero…
A: Linear programming can be used to find the best feasible solution to a problem. An optimum solution…
Q: Assume “Jane” saves $10,000 per year for 10 years starting at age 25. At age 35 she no longer is…
A: Particulars Amount (in $) Jane John Annual Savings 10000.00 10000.00 No. of years 10 30…
Q: A firm is planning to spend $75,000 on advertising. It costs $3000 per minute to advertise on…
A:
Q: A trust officer at the Blacksburg National Bank needs to determine how to invest $100,000 in the…
A: Given data: Bond Annual Return Maturity Risk Tax-Free A 9.5% Long High Yes…
Q: Evaluate how linear programming modeling helps managers in their analysis to make optimal decisions…
A: Linear Programming - It is the mathematical programming which is used to solve the optimal value of…
Q: Given the soft constraint X, + X2 +d* - d" = 45, which was originally the hard constraint X, + X2 =…
A: Slack and surplus variables are referred to as Deviational Variables (di — and di +) in general…
Q: Formulate and solve the following linear program: You are trying to create a budget to optimize the…
A: Maximize Z = 2F + 3S + 5E subject to F + S + E <= 1500 F + S <= 1100 S <= 800 E…
Q: • Formulate the problem of deciding how much of each product to make in the current week as a linear…
A: The linear programming method is a mathematical method by which the best outcome where profits are…
Q: The manager of a Burger Doodle franchise wants to determine how many sausage biscuits and ham…
A:
Q: How can integer programming be used to ensure that thevariable x can assume only the values 1, 2, 3,…
A: A variable X may take k different values with the probability that X=xi defined to be P(X=xi)=pi.…
Q: Define the different components (y, x, a, and b) of a linearregression equation
A: Linear regression is a method which explains us the relationship between two variables. This method…
Q: 40. Mutual Funds In 2015, the Phoenix/Zweig Advisors Zweig Total Return fund (ZTR) was expected to…
A: Z = Investment amount in ZTR M = Investment amount in MSP The objective is to maximize the return.…
Q: TRUE OR FALSE The graphical method of solving linear programs is useful because of its…
A: Graphical method of solving linear programs is the method which is used to find the highest and…
Q: Referring to Exhibit 1, what is the optimal objective function value for this problem? 500 300 800 O…
A: Linear programming model is used to obtain maximum profits, by utilizing minimum resources…
Q: Which of the following is not a continuous random variable? The possible amount of rain on a given…
A: A continuous random variable is a variable which can have infinite values since the values measured…
Q: simplex method provides a better solution in each iteration compared to its previous iteration in…
A: For solving LP problems, The Simplex Method is the most advanced solution algorithm. It is an…
Q: All of the following statements about a redundant constraint are correct EXCEPT a redundant…
A: A redundant constraint is a constraint which is easy to remove from the linear system without making…
Q: Home mortgage lenders often charge points on a loan in order to avoid exceeding a legal limit on…
A: Given data, The lender would loan $98 for each $100 borrowed The borrower receives $ 98 Loan…
Q: What are the optimal values of x, y and z? (Round your answers to nearest whole number.) Optimal…
A: Below is the solution:-
Q: a. Formulate a linear programming model that can be used to determine the number of gallons of…
A: Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: A group of 5 players play the following game. Each writes down a positive integer that is less than…
A: ANSWER:
Q: A savings and loan association estimates that the amount of money on deposit will be 10,000,000…
A: The revenue and cost for a bank are confusing as the bank loses money by paying interest on…
TRUE OR FALSE
The objective function may be expressed as an equation or as an inequality.
Step by step
Solved in 2 steps
- Although the normal distribution is a reasonable input distribution in many situations, it does have two potential drawbacks: (1) it allows negative values, even though they may be extremely improbable, and (2) it is a symmetric distribution. Many situations are modelled better with a distribution that allows only positive values and is skewed to the right. Two of these that have been used in many real applications are the gamma and lognormal distributions. @RISK enables you to generate observations from each of these distributions. The @RISK function for the gamma distribution is RISKGAMMA, and it takes two arguments, as in =RISKGAMMA(3,10). The first argument, which must be positive, determines the shape. The smaller it is, the more skewed the distribution is to the right; the larger it is, the more symmetric the distribution is. The second argument determines the scale, in the sense that the product of it and the first argument equals the mean of the distribution. (The mean in this example is 30.) Also, the product of the second argument and the square root of the first argument is the standard deviation of the distribution. (In this example, it is 3(10=17.32.) The @RISK function for the lognormal distribution is RISKLOGNORM. It has two arguments, as in =RISKLOGNORM(40,10). These arguments are the mean and standard deviation of the distribution. Rework Example 10.2 for the following demand distributions. Do the simulated outputs have any different qualitative properties with these skewed distributions than with the triangular distribution used in the example? a. Gamma distribution with parameters 2 and 85 b. Gamma distribution with parameters 5 and 35 c. Lognormal distribution with mean 170 and standard deviation 60The annual demand for Prizdol, a prescription drug manufactured and marketed by the NuFeel Company, is normally distributed with mean 50,000 and standard deviation 12,000. Assume that demand during each of the next 10 years is an independent random number from this distribution. NuFeel needs to determine how large a Prizdol plant to build to maximize its expected profit over the next 10 years. If the company builds a plant that can produce x units of Prizdol per year, it will cost 16 for each of these x units. NuFeel will produce only the amount demanded each year, and each unit of Prizdol produced will sell for 3.70. Each unit of Prizdol produced incurs a variable production cost of 0.20. It costs 0.40 per year to operate a unit of capacity. a. Among the capacity levels of 30,000, 35,000, 40,000, 45,000, 50,000, 55,000, and 60,000 units per year, which level maximizes expected profit? Use simulation to answer this question. b. Using the capacity from your answer to part a, NuFeel can be 95% certain that actual profit for the 10-year period will be between what two values?You are considering a 10-year investment project. At present, the expected cash flow each year is 10,000. Suppose, however, that each years cash flow is normally distributed with mean equal to last years actual cash flow and standard deviation 1000. For example, suppose that the actual cash flow in year 1 is 12,000. Then year 2 cash flow is normal with mean 12,000 and standard deviation 1000. Also, at the end of year 1, your best guess is that each later years expected cash flow will be 12,000. a. Estimate the mean and standard deviation of the NPV of this project. Assume that cash flows are discounted at a rate of 10% per year. b. Now assume that the project has an abandonment option. At the end of each year you can abandon the project for the value given in the file P11_60.xlsx. For example, suppose that year 1 cash flow is 4000. Then at the end of year 1, you expect cash flow for each remaining year to be 4000. This has an NPV of less than 62,000, so you should abandon the project and collect 62,000 at the end of year 1. Estimate the mean and standard deviation of the project with the abandonment option. How much would you pay for the abandonment option? (Hint: You can abandon a project at most once. So in year 5, for example, you abandon only if the sum of future expected NPVs is less than the year 5 abandonment value and the project has not yet been abandoned. Also, once you abandon the project, the actual cash flows for future years are zero. So in this case the future cash flows after abandonment should be zero in your model.)
- In the financial world, there are many types of complex instruments called derivatives that derive their value from the value of an underlying asset. Consider the following simple derivative. A stocks current price is 80 per share. You purchase a derivative whose value to you becomes known a month from now. Specifically, let P be the price of the stock in a month. If P is between 75 and 85, the derivative is worth nothing to you. If P is less than 75, the derivative results in a loss of 100(75-P) dollars to you. (The factor of 100 is because many derivatives involve 100 shares.) If P is greater than 85, the derivative results in a gain of 100(P-85) dollars to you. Assume that the distribution of the change in the stock price from now to a month from now is normally distributed with mean 1 and standard deviation 8. Let EMV be the expected gain/loss from this derivative. It is a weighted average of all the possible losses and gains, weighted by their likelihoods. (Of course, any loss should be expressed as a negative number. For example, a loss of 1500 should be expressed as -1500.) Unfortunately, this is a difficult probability calculation, but EMV can be estimated by an @RISK simulation. Perform this simulation with at least 1000 iterations. What is your best estimate of EMV?The IRR is the discount rate r that makes a project have an NPV of 0. You can find IRR in Excel with the built-in IRR function, using the syntax =IRR(range of cash flows). However, it can be tricky. In fact, if the IRR is not near 10%, this function might not find an answer, and you would get an error message. Then you must try the syntax =IRR(range of cash flows, guess), where guess" is your best guess for the IRR. It is best to try a range of guesses (say, 90% to 100%). Find the IRR of the project described in Problem 34. 34. Consider a project with the following cash flows: year 1, 400; year 2, 200; year 3, 600; year 4, 900; year 5, 1000; year 6, 250; year 7, 230. Assume a discount rate of 15% per year. a. Find the projects NPV if cash flows occur at the ends of the respective years. b. Find the projects NPV if cash flows occur at the beginnings of the respective years. c. Find the projects NPV if cash flows occur at the middles of the respective years.An automobile manufacturer is considering whether to introduce a new model called the Racer. The profitability of the Racer depends on the following factors: The fixed cost of developing the Racer is triangularly distributed with parameters 3, 4, and 5, all in billions. Year 1 sales are normally distributed with mean 200,000 and standard deviation 50,000. Year 2 sales are normally distributed with mean equal to actual year 1 sales and standard deviation 50,000. Year 3 sales are normally distributed with mean equal to actual year 2 sales and standard deviation 50,000. The selling price in year 1 is 25,000. The year 2 selling price will be 1.05[year 1 price + 50 (% diff1)] where % diff1 is the number of percentage points by which actual year 1 sales differ from expected year 1 sales. The 1.05 factor accounts for inflation. For example, if the year 1 sales figure is 180,000, which is 10 percentage points below the expected year 1 sales, then the year 2 price will be 1.05[25,000 + 50( 10)] = 25,725. Similarly, the year 3 price will be 1.05[year 2 price + 50(% diff2)] where % diff2 is the percentage by which actual year 2 sales differ from expected year 2 sales. The variable cost in year 1 is triangularly distributed with parameters 10,000, 12,000, and 15,000, and it is assumed to increase by 5% each year. Your goal is to estimate the NPV of the new car during its first three years. Assume that the company is able to produce exactly as many cars as it can sell. Also, assume that cash flows are discounted at 10%. Simulate 1000 trials to estimate the mean and standard deviation of the NPV for the first three years of sales. Also, determine an interval such that you are 95% certain that the NPV of the Racer during its first three years of operation will be within this interval.
- If you want to replicate the results of a simulation model with Excel functions only, not @RISK, you can build a data table and let the column input cell be any blank cell. Explain why this works.A company manufacturers a product in the United States and sells it in England. The unit cost of manufacturing is 50. The current exchange rate (dollars per pound) is 1.221. The demand function, which indicates how many units the company can sell in England as a function of price (in pounds) is of the power type, with constant 27556759 and exponent 2.4. a. Develop a model for the companys profit (in dollars) as a function of the price it charges (in pounds). Then use a data table to find the profit-maximizing price to the nearest pound. b. If the exchange rate varies from its current value, does the profit-maximizing price increase or decrease? Does the maximum profit increase or decrease?Based on Babich (1992). Suppose that each week each of 300 families buys a gallon of orange juice from company A, B, or C. Let pA denote the probability that a gallon produced by company A is of unsatisfactory quality, and define pB and pC similarly for companies B and C. If the last gallon of juice purchased by a family is satisfactory, the next week they will purchase a gallon of juice from the same company. If the last gallon of juice purchased by a family is not satisfactory, the family will purchase a gallon from a competitor. Consider a week in which A families have purchased juice A, B families have purchased juice B, and C families have purchased juice C. Assume that families that switch brands during a period are allocated to the remaining brands in a manner that is proportional to the current market shares of the other brands. For example, if a customer switches from brand A, there is probability B/(B + C) that he will switch to brand B and probability C/(B + C) that he will switch to brand C. Suppose that the market is currently divided equally: 10,000 families for each of the three brands. a. After a year, what will the market share for each firm be? Assume pA = 0.10, pB = 0.15, and pC = 0.20. (Hint: You will need to use the RISKBINOMLAL function to see how many people switch from A and then use the RISKBENOMIAL function again to see how many switch from A to B and from A to C. However, if your model requires more RISKBINOMIAL functions than the number allowed in the academic version of @RISK, remember that you can instead use the BENOM.INV (or the old CRITBENOM) function to generate binomially distributed random numbers. This takes the form =BINOM.INV (ntrials, psuccess, RAND()).) b. Suppose a 1% increase in market share is worth 10,000 per week to company A. Company A believes that for a cost of 1 million per year it can cut the percentage of unsatisfactory juice cartons in half. Is this worthwhile? (Use the same values of pA, pB, and pC as in part a.)
- Yearly oil production in Mexico, and yearly oil imports of the US from Mexico can be represented by the functions: P(t) = 3.0 – 0.13t million barrels I(t) 1.4 + 0.06t million barrels in year t, where t is the time in years since the start of 2000. a) What is represented by the functions P(t) – I(t) and I(t)/P(t)? What are the units for these functions? b) Let q(t) = I(t)/P(t). Compute q'(t) and q'(3). Interpret in a complete sentence. c) In marginal analysis, we would use q' (3) to estimate what quantity? Compute the actual value of that quantity and compare it with q'(3).Long-Life Insurance developed a linear model to determine the amount of term life insurance a family of four should have, based on the head of the household's current age. The equation is: y = 163 -0.45xwherey = Insurance needed ($000)x = Current age of head of household Calculate the amount of term life insurance you would recommend for a family of four if the head of the household is 53 years old. (Round your answer to 2 decimal places.)Define the different components (y, x, a, and b) of a linearregression equation