The manufacturing cycle efficiency for Sam Company when the processing time is seven hours and inspection, waiting, and move time are one hour each is: (round-off to 2 decimal places)
Q: There is no spoilage, the beginning WIP Inventory is 6,000 units, and the ending WIP Inventoryis…
A: Number of units transferred = Ending work in process+goods output-beginning work in process
Q: The production process shown below consists of five stages. The numbers in parentheses are the times…
A: a.
Q: The number of additional machines required is (Enter your response rounded up to the next whole…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: For each of the following variables, explain the differences (in general) as one movesfrom a work…
A: The throughput time of a product decreases as it moves from a work center environment to the…
Q: Jsing the Method of Least Squares, calculate the fixed cost of leasing. Round the fixed cost to the…
A: The Least-Squares regression model is a statistical technique. It is used to estimate a linear total…
Q: Suppose a chef ices and decorates cupcakes in batches of 100. Each batch requires 30 minutes to…
A: Batch size = 100 Processing time per unit = 2 minutes Setup time = 30 minutes Capacity = Batch size…
Q: Discuss each statement given below whether its true or false and explain briefly (a) If cycle time…
A: If cycle time is increased number of workers should also be increased to respond to related change.…
Q: Pipes are installed in a process with two resources. The first resource has a capacity of 0.34 pipes…
A: In order to arrive at the capacity of the pipes, first, we need to know the bottleneck. The…
Q: e) How much total idle time is present each cycle? f ) What is the efficiency of the assembly line…
A: Below is the solution
Q: The manufacturing cycle efficiency for NUBD Company when the processing time is nine hours and…
A: Small Introduction about Manufacturing Cycle Efficiency The percentage of production time spent on…
Q: The trim line at PW is a small subassembly line that, along with other such lines, feeds into the…
A: Note-We’ll answer the first three subparts of the question since the exact one wasn’t specified.…
Q: Compute the takt time for a system where the total time per shift is 420 minutes, there is one…
A: The answer is as below:
Q: The manufacturing cycle efficiency for NUBD Company when the processing time is seven hours and…
A: Throughput time is the total actual time incurred during the production of the product in an…
Q: Given the following information, compute the takt time: Total time per shift is 480 minutesper day,…
A: Formula:
Q: A manufacturer's average WIP inventory for Part #2934 is 900 parts. The workstation produces parts…
A: Little's law states lead time (aka flow time) = Work in progress / Thorughput this can also be…
Q: What is the effect of waiting time on a manufacturing process? Why is it good to reduce waiting…
A: Waiting time essentially affects producing measure. The longer the cycle is in pausing, the higher…
Q: A production line with four automatic workstations (the other stations are manual) produces a…
A: Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: 1. Calculate the total time it takes to produce a batch of 10 units using the traditional…
A: Instead of grouping work items into batches, continuous flow is a Lean strategy that allows you to…
Q: First question in the image Question N0 2: A production line has an hourly throughput rate 6…
A: Given data - Task A Task B Processing time (Min) 9 12 No. of worker 1 1
Q: Two machines A and B produce items at the rate of 50 units per hour and 40 units per hour…
A: The answer is as below:
Q: 9.17 Tailwind, Inc., produces high-quality but expensive craining shoes for runners. The Tailwind…
A: Here we have Ta=Total time availaible =400 minutes per dayDa=Daily production rate required= 62…
Q: a. If the desired daily output is 472 units, how many units must be started to allow for loss due to…
A: Production is the process of converting raw materials and resources into finished products and…
Q: Find the minimum number of machines (integer) required to achieve target production for the…
A: In the question, we have various data, these are Target production volume for a year, standard time…
Q: Given the following information, compute the takt time: Total time per shift is 480 minutes per day,…
A: Takt Time = Net time available per day/ Daily demand Daily demand = 80
Q: A production line is to be designed to make 500 El-More dolls per day. Each doll requires 11…
A: given, per day designed doll = 500 factory operates = 750 per day
Q: compare the assembly line in china to that in sam francisco along the following dimension: (1)…
A: An assembly line is a production system (also known as progressive assembly) in which components are…
Q: Meals are cooked in a process with two resources, The first cesource has a capacity of 9.5 meals per…
A: Given - Process Demand = 7.2 meals per hour 1st Resource capacity = 9.5 meals per hour 2nd Resource…
Q: A production process consists of a three-step operation. The scrap rate is 10 percent for the…
A: Given that,Scrap rate at step-1 = 10% = 0.10Scrap rate at step-2 = 6% = 0.06Scrap rate at step-3 =…
Q: A process has 2 steps: Step A and Step B. The stage capacities of the two steps are listed in the…
A: Here the process has 2 steps, step A and step B, for each step, we have the stage capacity, to…
Q: You have been asked to put together a capacity plan for a critical operation at the Surefoot Sandal…
A: Formula:
Q: 40 & 42
A: Note: First question was answered. Kindly post another question seperatelyDetermine the option that…
Q: . A process makes two products, A and B, and operates 5 days per week, 7 hours per day.Demand for…
A: Takt time = available time/rate of customer demandtakt time = 5*7takt time = 35Demand for product A…
Q: is the bottleneck. b) The bottleneck time is minutes per unit (round your response to two decimal…
A: Given Information: Process/Workstation name Process capacity Sawing 1.8 units per hour…
Q: A manufacturing plant has the process displayed below. The drilling operation occurs separately from…
A: A) Bottleneck Bottleneck is the cycle or a stage that restricts a whole framework's ability to…
Q: a)Provide one relatable and relevant example of five of the eight wastes under Lean systems which…
A: A Lean system involves Lean principles to plan, prioritize, manage, and measures work. The motive…
Q: 1. Aljon, a softdrink dealer, delivers 14 cases on Monday, 10 cases on Tuesday, 12 cases on…
A: No. of cases delivers on Monday =14 No. of cases delivers on Tuesday = 10 No. of cases delivers on…
Q: Purple Swift manufactures birdhouses in lots of 10. Eachbirdhouse takes 45 minutes to paint. After…
A: Utilization = Average Output Rate / Maximum Capacity Utilization = [(Number of lots x Setup Time) +…
Q: Coleman Rich, Ltd., has received the followingorders:Period 1 2 3 4 5 6 7 8 9 10Order size 60 30 10…
A: Given Usable minutes in a week - 2250 minutes Each unit takes 65 minutes to complete
Q: FOR THIS QUESTION, WOULD STORAGE TIME BE INCLUDED IN THE SUM FOR THROUGHPUT TIME? ALSO COULD YOU…
A: For the above question throughout put time is calculated as below:
Q: A firm uses a serial assembly system and needs answers to the following:a. An output of 900 units…
A:
Q: Manufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials…
A: Required 6 Cost of units transferred to finished goods : 301,279 7 The cost of spoilage charged to…
Q: 7. Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Given data; Total time per shift 480 min No. of shifts 1 shift Rest break 30 min Lunch…
Q: For each of the following variables, explain the differences (in general) as one moves from a…
A: Development is a process of creating growth, positive changes in something or someone in order to…
Q: The following diagram describes a manufacture process where products go through four parallel…
A: Bottleneck activity defines as the process that reduces the limited capacity of the whole chain. The…
Q: Compute the required cycle time for a process that operates 8 hours daily with two 15 min break and…
A: THE ANSWER IS AS BELOW:
Q: The trim line at PW is a small subassembly line that, along with other such lines, feeds into the…
A: THE ANSWER IS AS BELOW:
Q: Jason Carter works for a producer of soaps that come inpackages of 6 each. His job is to fi ll the…
A: Demand rate, d = 35 packages per hourContainer size, C = 5 packagesLead time, L = 30 minutes = 0.5…
Q: ious speeds and requires periodic tool regrinding at the intervals cited. Speed Output per Hour Tool…
A:
The manufacturing cycle efficiency for Sam Company when the processing time is seven hours and inspection, waiting, and move time are one hour each is: (round-off to 2 decimal places)
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
- C&A Furniture uses a four-step process to make its famous wood table: Processing Time Process Milling Table top Milling Table stand Assembly Finishing The milling machine requires a setup time of 30 minutes to make table tops and a changeover time of 30 minutes to make table stands. If the batch size is 10, what is the capacity of the process in tables per minute? A) 0.077 B) 0.05 C) 0.067 10 5 15 20 D) 0.048Tuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 90. The projected demand, lot size, and time standards are shown in the following table: LOADING... Item Touring Mountain Demand forecast 4,000 units/year 12,000 units/year Lot size 110 units 90 units Standard processing time 0.30 hour/unit 0.75 hour/unit Standard setup time 2 hours/lot 3 hours/lot The shop currently works 8 hours a day, 5 days a week, 50 weeks a year. It operates five workstations, each producing one bicycle in the time shown in the table. The shop maintains a 15 percent capacity cushion. How many workstations will be required next year to meet expected demand without using overtime and without decreasing…Up, Up, and Away is a producer of kites and wind socks.Relevant data on a bottleneck operation in the shop for theupcoming fiscal year are given in the following table:Item Kites Wind SocksDemand forecast 30,000 units/year 12,000 units/yearLot size 20 units 70 unitsStandard processing time 0.3 hour/unit 1.0 hour/unitStandard setup time 3.0 hours/lot 4.0 hours/lotThe shop works two shifts per day, 8 hours per shift, 200 daysper year. Currently, the company operates four machines,and desires a 25 percent capacity cushion. How many ma-chines should be purchased to meet the upcoming year’s de-mand without resorting to any short-term capacity solutions?
- Yost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown in Figure. Raw materials and purchased parts (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to work on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Which of the four workstations, W, X, Y, or Z, has the highest aggregate workload, and thus…XYZ is famous for homemade pizzas which are crisp with thin crust and varied toppings giving the pizzas fabulous tastes. XYZ· is revamping its order processing and pizza-making process. In order to deliver fresh pizza fast, six work elements must be completed as shown in the table below :Element Description Precedence Time (in min)A Receive order - 2·0B Shape dough A 1·0C Prepare toppings A 2·0D Assemble pizza B, C 3·0E Bake pizza D 3·0F Deliver pizza E 3·0Construct a precedence diagram for the process.If the demand is 120 pizzas per night (5:00pm to 1:00am), compute the cycle time for the process. Compute the lead time for the process.What is the theoretical minimum number of workstations needed to achieve the required production?How will you balance the production line to produce and deliver 120 pizzas per night? What is the actual minimum number of workstations needed?Up, Up, and Away is a producer of kites and wind socks. Relevant data on the bottleneck operation in the shop for the upcoming fiscal year are given in the following table Wind Socks 10,000 units/year Item Demand forecast Lot size Standard processing time Standard setup time Kites 32,000 units/year 25 units 0.4 hourlunit 3.0 hours/lot 70 units 0.8 hour/unit 40 hours/fol The shop works two shifts per day, 8 hours per shift, 210 days per year. Currently, the company operates four machines, and desires a 25 percent capacity cushion. How many machines should be purchased to meet the upcoming year's demand without resorting to any short-term capacity solutions? The number of additional machines required is (Enter your response rounded up to the next whole number)
- The Assembly Department started the month with 37,000 units in its beginning work in process inventory. An additional units 482,000 were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 34,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing department during the month? A. none of the options B. 485,000 C. 473,000 D. 479,000What is OEE and also calculate the OEE from the given data in below table. Item Data Shift Length 8 hours Breaks (2) 15 minute and (1) 30 minute Downtime 47 minutes Ideal Cycle Time 1.0 seconds Total Count 19,271 widgets Reject Count 423 widgetsYork-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to work on that workstation alone and is paid $17 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Product A $11 Step 1 Station W (14 min) Step 2 Station Z (10 min) Raw materials $5 Purchased part…
- The manufacturing cycle efficiency for NUBD Company when the processing time is seven hours and inspection, waiting, and move time are one hour each is: (round-off to 2 decimal places)Yost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to working on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Which of the four workstations, W, X, Y, or Z has the highest aggregate workload, and thus…The manufacturing cycle efficiency for NUBD Company when the processing time is nine hours and inspection, waiting, and move time are one hour each is: (round-off to 2 decimal places)