(a) Generate the optimal sequence of jobs. Calculate the best schedule for the supervisor that will minimize the make span of the five jobs. (b) Determine the total length of time of this optimal solution.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question

production operation management

please answers as soon as possibl

Q5
Five jobs are waiting for processing through two work centers. Their processing time (in
minutes) at each work center is contained in Table Q5 below. Each job requires work center
Alpha before work center Beta.
(a)
(b)
Table Q5: Processing time (in minutes) at work centers
Job
R
S
T
U
V
Alpha
40
25
50
35
55
Generate the optimal sequence of jobs.
Beta
10
30
20
35
15
Calculate the best schedule for the supervisor that will minimize the make span
of the five jobs.
Determine the total length of time of this optimal solution.
Transcribed Image Text:Q5 Five jobs are waiting for processing through two work centers. Their processing time (in minutes) at each work center is contained in Table Q5 below. Each job requires work center Alpha before work center Beta. (a) (b) Table Q5: Processing time (in minutes) at work centers Job R S T U V Alpha 40 25 50 35 55 Generate the optimal sequence of jobs. Beta 10 30 20 35 15 Calculate the best schedule for the supervisor that will minimize the make span of the five jobs. Determine the total length of time of this optimal solution.
Expert Solution
steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,