1 Assignment of jobs to machines 2 3 Input Data 4 5 Machine 1 6 Machine 2 7 Machine 3 8 Machine 4 9 Machine 5 10 Required Machines Job 1 14 11 12 Network structure and flows 13 List of arcs in the network by (Origin, Destination) 14 15 2 7 2 5 Job 2 5 12 8 4 5 Job 3 8 6 3 6 4 Job 4 7 5 9 10 Capacity Paste the used Range Names Flow balance constraints 1 Nodes with only outflows (total outflows ce capacity)

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question
NEED ALL
1. Nodes with only outflows (total outflows <= capcity)
2. Nodes with only inflows (total inflows >= demand)
3. Nodes with both outflows and inflows (total outflows = total inflows)
4. Network structure and flows (List of arcs in the network by (Origin, Destination)
5. Objective to minimize
240
21
22
23
24
25
26
27
28
29
30
31
33
34
35
36 Objective to minimize
37
2. Nodes with only inflows (total inflows demand)
3. Nodes with both outflows and inflows (total outflows total inflows)
Transcribed Image Text:240 21 22 23 24 25 26 27 28 29 30 31 33 34 35 36 Objective to minimize 37 2. Nodes with only inflows (total inflows demand) 3. Nodes with both outflows and inflows (total outflows total inflows)
1 Assignment of jobs to machines
3 Input Data
4
Job 1
5 Machine 1
6 Machine 2
7 Machine 31
8 Machine 4.
9 Machine 5
10 Required Machines
11
12 Network structure and flows
13 List of arcs in the network by (Origin Destination)
14
15
16
17
18
19
14
2
7
2
Job 2
5
12
8
4
5
1
D
Job 3
8
6
3
6
4
1
E
Job 4
7
5
9
10
B
F
Capacity
G
H
Paste the used Range Names
Flow balance constraints
1. Nodes with only outflows (total outflows ce capacity)
Transcribed Image Text:1 Assignment of jobs to machines 3 Input Data 4 Job 1 5 Machine 1 6 Machine 2 7 Machine 31 8 Machine 4. 9 Machine 5 10 Required Machines 11 12 Network structure and flows 13 List of arcs in the network by (Origin Destination) 14 15 16 17 18 19 14 2 7 2 Job 2 5 12 8 4 5 1 D Job 3 8 6 3 6 4 1 E Job 4 7 5 9 10 B F Capacity G H Paste the used Range Names Flow balance constraints 1. Nodes with only outflows (total outflows ce capacity)
Expert Solution
steps

Step by step

Solved in 4 steps with 10 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,