using the text What are the three principal planes of projection? Provide examples.
Q: Determine to support the load W. Given: a = 8 ft b = 6 ft c=2 ft d = 2 ft e = 6 ft = 500 Ib W = the…
A:
Q: Suppose it is required to tape a length of 2500 ft with an error of not more than ±0.10 ft. If you…
A:
Q: uppose that F1=4kN. a) Determine the magnitude of the resultant force FR=F1+F2. b) Determine…
A:
Q: 14 Thermal stress only occurs if the material is restricted from deforming freely. O True O False
A: Thermal stresses are induced due to change in temperature of a bar. The stresses depend on the…
Q: A sector gate is provide on a spillway as shown in the figure. Assuming g = 10,/s², the resultant…
A: Given Data g = 10 m/s2 Find the resultant force acting on gate (KN/m)
Q: The 9500-lb pipe is supported by three cables. Determine the force in each cable for equilibrium of…
A:
Q: A two spans continuous concret beam is to be Supported by three concreted columns spaced (8,50 m) on…
A: Answer We can use ACI coefficient method to determine the Moment at section b-b From ACI code, we…
Q: The figure below (Figure 1-15 in the book) Intensity-Duration-Frequency (IDF) shows curves for…
A: Intensity frequency curve (IDF): It is graph between rainfall intensity and duration of storm for a…
Q: Shouldn't every known hazard category be included, arranged by frequency of occurrence, and…
A: No, not every category of known hazards needs to be included, organised by frequency of occurrence,…
Q: a. Determine the maximum flexural compressive stress in the beam. Answer in MPa rounded-off to 3…
A:
Q: what is the horizontal component of 60 kN? a. 51.96 kN b. 52.96 kN c. 53.96 kN d. 54.96 kN what…
A: Given data in question Load 30, 40, 15, & 60kN Span 40 m 3 hinged arch To find out Horizontal…
Q: 7 1 التاريخ 2 الموضوع Q₁: The 300 mm X 300mm concrete columu. (EC 25 GPa and ac = 5.5 X 106 / "℃) is…
A: Given Data Size of column = 300mm × 300mm Diameter of reinforcement (d) = 18 mm × 4 no. Modulus of…
Q: Three types of aggregate have sieve analysis as given below. Combine these types of aggregate to…
A: Given: Sieve, (in) 3/4 1/2 3/8 No. 4 No. 8 No. 30 No. 50 No. 100 No. 200 Specif. 100 80-100…
Q: A rigid bar is supported by two coppe r rods and the gap between the alumi num rod and the bar is 1…
A:
Q: Select the correct answer for the followings: 1. PVC pipe is not used in exposed services because;…
A: Note : As per guidelines, I will answer the first question as the questions are not related to each…
Q: A grade of 0.4 percent is being considered for a mountain roadway. The elevation at the initial…
A: Elevation is the point whose height above a reference datum is noted. Given Data:…
Q: 4. A two-component composite structure is vertically loaded through rigid end plates. What fraction…
A:
Q: A company that manufactures pulse Doppler insertion flow meters uses the Straight Line method for…
A: Given: First cost = $120000 Salvage value = $16500 Life = 3year Required : Depreciation charge and…
Q: A simply supported prestressed concrete beam with a cross-section of (200 mm width and 400 mm depth)…
A: width - 200 mm depth - 400 mm deflection -60 mm Ec =0.2 Ec short Ec short=28×106 kN/m2 Ec=5.6×106…
Q: Given the Following beam in simple flexure, loaded at midspan: P Section Span, L 1 D) Sketch Shear…
A: As per Bartleby's guidelines we are supposed to answer only first question. Kindly repost other…
Q: A composite beam is fabricated by bolting two 2.1-in.-wide by 14-in.-deep timber planks to the sides…
A:
Q: What is the efficiency of joint when strength of bolt per pitch length is 60 KN and strength of…
A: Given: Strength of bolt per pitch length = 60 kN. Strength of plate per pitch length = 150 kN
Q: Dimensional and Model Analysis Question 5: A turbine works at 20 m head and 500 rpm speed. Its 1:2…
A: Given- Head of turbine Hm=20 m Head of prototype Hp=20 m, Speed Np=500 rpm, Scale=1:2 It is needed…
Q: For the shape shown, a = 4 in., b = 28 in., and d = 16 in. Calculate the vertical distance from…
A:
Q: What is the approximate value of the tensile strength governed by yielding of the cross section of a…
A: Given- Roof truss diagonal100×75×6 mmfy=250 Mpa4 mm welds It is needed to find the tensile strength…
Q: Ex. A driver of a car applied the brakes and barely avoided hitting an obstacle on the roadway. The…
A:
Q: For the beam shown: 1. Draw the free-body diagram (FBD) and determine the reactions at the supports.…
A:
Q: Onestion 2 : Choose the correct letter, A, B, C or D A 1 Esumate the flow velocity in m/s through a…
A:
Q: The soil profile from a geological map of a project site obtained during a Phase I investigation is…
A: Steps: 1. Making plans for a soil exploration campaign.2. Taking soil or rock samples from the…
Q: Find the quarry productivity per hour for the quarry unde the following conditions: The length of…
A: To calculate the quarry productivity per hour, we can use the following formula: Productivity…
Q: In a drained triaxial compression test conducted on dry sand, failure occurred when the deviator…
A:
Q: urveying using trapezoidal rule, simpson rule and area division
A: Data provided : Note : ( Unit of length not given considering it in Meter) Total Length = 13 meter…
Q: 2. A block made of 40MPa concrete with dimensions as shown. What is the maximum force that it can…
A:
Q: Based from the proportion that you have designed, say that the concrete is mixed to fill 20 cubes…
A: Given, Cement content = 370 kg/m3 Water content = 195 kg/m3 Fine aggregate content = 490 kg/m3…
Q: Problem 6: Inputs: ● ● ● ● a = 600 mm b = 400 mm c = 200 mm F = 100 N The line of action of the…
A: Given: a = 600mm b = 400mm c = 200mm F = 100N Required: Moment at point A considering different…
Q: Question civil engineering- The total observed runoff volume during a 6h storm with a uniform…
A: Given- 6 hour storm, t=6 hour Intensity I=1.5 cm/hr Runoff volume 23.04×106 m3, Area A=320 km2 It is…
Q: explain the shear and moment diagram
A:
Q: Problem 7 The cantilever truss is part of vertical support system subjected to dead loads (D) and…
A:
Q: 1. (a) The velocity vector in an incompressive flow is given by - V = (6xt + yz²)i + (3t + xy²)j +…
A: Given data- Velocity vector in an in-compressive flow- V=6xt+yz2i + 3t+xy2j + xy-2xyz-6tzk, To Find-…
Q: 50 kN 200 mm B 350 mm a 60 mm 200 mm - change the length of segment BC from 350 mm to 312 mm 50 mm…
A: Given: Length of BC changes from 350mm to 312mm Required : Normal force diagram
Q: Q5/ From the beam loaded shown in figure 5, determine the support reactions at Roller (B) and hinge…
A: Given, Beam with multiple loading and overhangs on both sides To find : Support reactions
Q: A hollow cylindrical shaft was designed to have a uniform wall thickness of 0.1 in. Defective…
A: Given:- The uniform wall thickness = 0.1 in The magnitude of the torque applied to the shaft = 13…
Q: Determine the axial forces for which the member CD should be designed given the following service…
A: Given dead load on girder BC= 1kips/ft Live load on girder BC = 2kips/ft wind load of 20 kips/ft
Q: In a soil investigation work at a site, Standard Penetration Test (SPT) was conducted at every 1.5 m…
A: Given SPT test data Number of blows at 150 mm successive penetrations- 8, 6 & 9.
Q: 2. Compute the reactions of the fixed support at K.
A: Given:- A beam system having different loading on different beams To find:- Reactions of the fixed…
Q: 8.77 According to fire regulations in a town, the pressure drop in a commercial steel horizontal…
A: Given, Acceptable pressure loss, ∆P = 1 psi per 150 ft pipe Flow rate, Q = 500 gpm or 1.11 cfs
Q: 3.3 The moist weight of 0.1 ft' of soil is 12.2 lb. If the moisture content is 12% and the specific…
A:
Q: Plot the points whose polar coordinates are given below, then convert each point from polar to…
A:
Q: Q-OCF A rectangular open channel has a width of 5m and a bed slope of 0.001. For a uniform flow of…
A:
Q: A lake with a surface area of 1260 acres was monitored over a period of time. During a one-month…
A: Given data in question Area 1260 acres Inflow 44 cfs Outflow 26 cfs Seepage 1.6 in Evaporation 3 in…
using the text What are the three principal planes of projection? Provide examples.
Step by step
Solved in 4 steps with 3 images
- Using engineering graphics and drafting concepts . Draw the isometric view of the given orthographic projection of the object. Use the software CATIA V5 to sketch the isometric Give the dimension in isometric view drafting Skip if not have ,don't rejectSubject: Engineering Drawing or AutoCAD Instruction: Draw the 2D Orthographic Projection (Front, Top, and Right or Left Side Views) of the indicated 3D Drawing (Isometric View). You can frechand draw or use AutoCAD. Note: Indicate the Dimensions. TOP 50 930 915 2holes RIS 59 26 63, **units in mm FRONTprojection of line
- Sketch thefollowing figure ,orthographic view ( using catia ) Metion the top view side view and bottom viewsketch an orthographic projection drawing of Multiview projection include the Plan View, Front View and Side View from the picture object as given using third angle projection and the symbol.Subject: Engineering Drawing or AutoCAD Instruction: Draw the 2D Orthographic Projection (Front, Top, and Right or Left Side Views) of the indicated 3D Drawing (Isometric View). You can frechand draw or use AutoCAD. Note: Indicate the Dimensions. FRONT **units in mm 10
- Draw the 3 Principal Views of the object (units in cm) 5.0 3.0 1.5 R=1.0 1.5 1.0 - 3.0 -2.5 2.0Given the following isometric drawing, how many edges are drawn as points in the right side view of the object in multiview drawing? a. 2 b. 3 C. 4 d. 0 y :Civil Engineering Orthographic and isometric projections are two basic types of graphic projection Select one: a. False b. True
- The following contains lines AB, CD, and EF. Complete all views. Label lines that are true length as TL. EF(PV) c+ + HRP FRP A A Projection | of D 1 1 B B FRP તસવ E TL CD (PV) g+ FFind y-coordinate of the centroidA Figure shows an isometric view of an object. Draw to a full size scale thefollowing views in first angle projection.(a) Sectional front view, (b) Top view and (c) Sectional side view