Two tangents converge at an angle 26.3 degrees, which were connected by a reverse curve. The direction of the second tangent is due to East which is having the shortest distance to the point PRC of 131.24 meters. What is the total cost of the reverse curve road in pesos if the bearing of the common tangent is S 44.5 E. Take into consideration that the length of the first tangent is half the length of the second tangent. Station PC is at Sta 10+620. The following are the cost index and specification: Type of Pavement Item 311 (Portland Cement Concrete Pavement) Number of Lanes Four Lanes Width of Pavement = 3.6 m per lane Thickness of Pavement - 25.3 cm Unit Cost = Php 1,587.256 per cubic meters

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Two tangents converge at an angle 26.3 degrees, which were connected by a
reverse curve. The direction of the second tangent is due to East which is
having the shortest distance to the point PRC of 131.24 meters.
What is the total cost of the reverse curve road in pesos if the bearing of the
common tangent is S 44.5 E. Take into consideration that the length of the first
tangent is half the length of the second tangent. Station PC is at Sta 10+620.
The following are the cost index and specification:
A
Type of Pavement = Item 311 (Portland Cement Concrete Pavement)
Number of Lanes = Four Lanes
Width of Pavement
3.6 m per lane
Thickness of Pavement 25.3 cm
Unit Cost = Php 1,587.256 per cubic meters
N
Transcribed Image Text:Two tangents converge at an angle 26.3 degrees, which were connected by a reverse curve. The direction of the second tangent is due to East which is having the shortest distance to the point PRC of 131.24 meters. What is the total cost of the reverse curve road in pesos if the bearing of the common tangent is S 44.5 E. Take into consideration that the length of the first tangent is half the length of the second tangent. Station PC is at Sta 10+620. The following are the cost index and specification: A Type of Pavement = Item 311 (Portland Cement Concrete Pavement) Number of Lanes = Four Lanes Width of Pavement 3.6 m per lane Thickness of Pavement 25.3 cm Unit Cost = Php 1,587.256 per cubic meters N
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Highway surveys and location
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning