The given data of a proposed road is tabulated below. The free haul distance is 50m and the cost of borrow Is 420 Php per m, the cost of excavation Is 350 Php per m, and the cost of haul Is 21 Php per meter-station. The ground surface Is assumed to be uniformly sloping. Station Area In m2 Area in m2 cut fill 2+440 50 2+740 3+040 70 What is the limit of economic haul? [ Select] What is the free haul volume? [Select] What is the overhaul volume? [ Select) What is the waste volume? Select] m3 What is the borrow volume? Select) What is the length of the over haul? (Select ] in m What is the overhaul? [ Select ] in meter-station

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
The glven data of a proposed road Is tabulated below. The free haul distance Is 50m and the
cost of borow Is 420 Php per m the cost of excavation Is 350 Php per m, and the cost of
haul Is 21 Php per meter-station. The ground surface Is assumed to be uniformly sloping.
Station
Area In m2
Area in m2
cut
fill
2+440
50
2+740
3+040
70
What is the limit of economic haul? [ Select]
What is the free haul volume? [ Select]
What is the overhaul volume?(Select]
m²
What is the waste volume? [Select]
m3
What is the borrow volume? Select]
m
What is the length of the over haul? ( Select ]
in m
What is the overhaul? Select]
in meter-station
Transcribed Image Text:The glven data of a proposed road Is tabulated below. The free haul distance Is 50m and the cost of borow Is 420 Php per m the cost of excavation Is 350 Php per m, and the cost of haul Is 21 Php per meter-station. The ground surface Is assumed to be uniformly sloping. Station Area In m2 Area in m2 cut fill 2+440 50 2+740 3+040 70 What is the limit of economic haul? [ Select] What is the free haul volume? [ Select] What is the overhaul volume?(Select] m² What is the waste volume? [Select] m3 What is the borrow volume? Select] m What is the length of the over haul? ( Select ] in m What is the overhaul? Select] in meter-station
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning