The city engineer and economic development directors are evaluating two sites for construction of a multipurpose sports arena. The sites are downtown (DT) and southwest (SW) of the metropolitan area. The city already owns enough land at the DT site; however, the land for a parking garage will cost $1 million, and construction costs will be $12 million for the parking garage, infrastructure relocation, and drainage. The SW site is 30 km from downtown, but the land will be donated by a developer who knows that an arena at this site will dramatically increase the value of the remainder of his land holdings. Because of its centralized location, there will be greater attendance at most of the events held at the DT site. This will result in more revenue to vendors and local merchants in the amount of $500,000 per year. Additionally, the average attendee will not have to travel as far, resulting in annual benefits of $400,000 per year. All other costs and revenues are expected to be the same at either site. If the city uses a discount rate of 8% per year, and will construct at one site or the other, which site should be selected? Use a 30-year study period. The AB/C ratio is Select site (Click to select)

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
4
The city engineer and economic development directors are evaluating two sites for construction of a multipurpose sports arena. The
sites are downtown (DT) and southwest (SW) of the metropolitan area. The city already owns enough land at the DT site; however, the
land for a parking garage will cost $1 million, and construction costs will be $12 million for the parking garage, infrastructure relocation,
and drainage. The SW site is 30 km from downtown, but the land will be donated by a developer who knows that an arena at this site
will dramatically increase the value of the remainder of his land holdings. Because of its centralized location, there will be greater
attendance at most of the events held at the DT site. This will result in more revenue to vendors and local merchants in the amount of
$500,000 per year. Additionally, the average attendee will not have to travel as far, resulting in annual benefits of $400,000 per year.
All other costs and revenues are expected to be the same at either site. If the city uses a discount rate of 8% per year, and will
construct at one site or the other, which site should be selected? Use a 30-year study period.
The AB/C ratio is
Select site
(Click to select)
Transcribed Image Text:The city engineer and economic development directors are evaluating two sites for construction of a multipurpose sports arena. The sites are downtown (DT) and southwest (SW) of the metropolitan area. The city already owns enough land at the DT site; however, the land for a parking garage will cost $1 million, and construction costs will be $12 million for the parking garage, infrastructure relocation, and drainage. The SW site is 30 km from downtown, but the land will be donated by a developer who knows that an arena at this site will dramatically increase the value of the remainder of his land holdings. Because of its centralized location, there will be greater attendance at most of the events held at the DT site. This will result in more revenue to vendors and local merchants in the amount of $500,000 per year. Additionally, the average attendee will not have to travel as far, resulting in annual benefits of $400,000 per year. All other costs and revenues are expected to be the same at either site. If the city uses a discount rate of 8% per year, and will construct at one site or the other, which site should be selected? Use a 30-year study period. The AB/C ratio is Select site (Click to select)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.