My Happy Feet Company manufactures athletic shoes. The company wants to establish a p chart to monitor the production process using Z=3.00. The company has taken a sample of 50 shoes every 4 hours for a work week of five days. Since the company runs two 8-hour shifts each day, this will result in 20 samples. The sample results are as follows. Sample 1 2 3 4 5 7 8 9 10 12 13 14 15 16 17 18 19 20 Number of Defectives 0 1 0 3 2 5 3 2 1 0 I 2 2 3 1 5 2 n = 56 0 100 Answer these questions: a. Construct a p-chart to monitor this p b. Plot the p-chart graph. c. indicate if the process was out of control at any time process.
Q: Calculate the average inventory
A: EOQ stands for economic order quantity. It is a company's optimal order quantity that undervalues…
Q: A regional bank training center has the physical ability to handle 1,300 participants. However,…
A: Efficiency and utilization are two terms related with calculating the process quality based on the…
Q: 1. Boxes of Honey-Nut Oatmeal are produced to contain 16.0 ounces, with a standard deviation of…
A: Given data: Mean value (X-double bar) = 16.0 ounces Standard deviation (σ)=0.10 ounce Sample size…
Q: b. A food manufacturer wants to locate a warehouse to serve its major customers. The customers,…
A: Formulae used: Center of Gravity Method Cx= ∑dix × Vi∑Vi CY= ∑diY × Vi∑Vi where, Cx = is the X…
Q: The Biggs Department Store chain has hired an advertising firm to determine the types and amount of…
A: Assume decision variables as T, R, and N.
Q: The Ottery Creek Winery produces three kinds of table wine - a blush, a white, and a red. The winery…
A: Let Blush wine, white wine and red wine be represented by B, W and R respectively. Maximize…
Q: Describe the steps used to develop a forecasting system.
A: Forecasting is a method of predicting the unknown. In other words, it is a step forward by looking…
Q: Solve the following linear programming problem using simplex method. A diet for a sick person must…
A: Let Food A = x1 and Food B = x2
Q: ERP provides organizations with integrated operations, placing a new emphasis on customer…
A: A form of technology known as enterprise resource planning (ERP) is generally utilized by…
Q: Lower days of supply means O more, more O more, less les, more O less, less inventory. Lower turns…
A: The goal of any business is to sell as much product as possible in as little time as possible, so…
Q: A lawn and garden store creates three different potting mixes sold in 20-pound bags. Mox A contains…
A: Given data is Mix Peat req (pounds) Perlite req (pounds) Organic material req (pounds) Profit A…
Q: Planning for quality is necessary but often forgotten or dismissed function on a project. Discuss…
A: A project quality plan is one of the important component of the project management. At the…
Q: Explain the use of a flowchart in operational design.
A: Operational design is the detailed design for the organizational operations, and is helpful for the…
Q: Problem 12-3 (Static) A large bakery buys flour In 25-pound bags. The bakery uses an average of…
A: Annual Demand = D = 1215 bags Ordering Cost = S = $10 Annual carrying cost per bag = $75
Q: An institution has 7 departments. The closeness chart is given in the following table. 1. Material…
A: Here consider: Here 1 Material Storage 2 Forming 3 Machining 4 Painting 5 Assembly…
Q: Describe a service experience where operations related issues resulted in an service product that…
A: In an organization, no department can work in isolation to other departments. Every department is…
Q: A home improvement store sells hydrangea plants during the spring planting season. The hydrangeas…
A: Cost = $15 per unit Selling price = $45 per unit Salvage value = $7 per unit Service level = 99%…
Q: William Beville's computer training school, in Richmond, stocks workbooks with the following…
A: Given data: Part 1) Annual demand (D) = 19,500 units/year Ordering Cost (S) = $25/Order…
Q: Answer the following questions based on the Tornado and Sensitivity graphs given below. Which input…
A: In optimization, it is important to identify a variable that requires effort to evaluate but has the…
Q: Why is it so difficult to expand a service company across borders to another country? What are the…
A: There are various methods companies can take to expanding their business internationally, and each…
Q: A car wash offers two different types of wash services, deluxe wash and standard wash. The deluxe…
A: Implied utilization is the proportion between total demand of a task and the capacity of the…
Q: A part of a project that includes activities as in the table below, required: Draw an arrow chart…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: Metropolitan General Hospital is a city-owned and operated public hospital. Its emergency room is…
A: Find the Calculation methods below: X Bar - Average of 5 days waiting timeẌ - Average of X BarRange…
Q: a. If you start the project immediately, when will it be finished? The critical path is path and the…
A: Critical path is a term that is used in project management. It refers to the tasks that have to be…
Q: 1. The most-desired management skill is good communication, followed by a sense of vision, honesty,…
A: The media selection framework refers to the matrix that helps the decision-maker to select the…
Q: Describe how MRP concepts could be used for the following service operations: a. Hotel
A: The term MRP is an acronym for Manufacturing Resource Planning. The MRP system was developed in the…
Q: Using any organisation of your choice describe the significance of operations managers and how they…
A: Key Advantages inside Effective Operations ManagerProduct Quality - The quality of a product alludes…
Q: hat is the probability that the shop is empty? What is the average number of customers in the…
A: NOTE: We are allowed to do the first three sub-parts only. Queueing theory is a mathematical model…
Q: Questions 1.Explain using illustrations how forecasting features in this company's operations.…
A: Forecasting is a technique to predict future value. It is useful to predict future demand, sales, or…
Q: Audi Profile, History and Status Quo: In 1910, the first Audi car was produced in Zwickau, Saxony.…
A: The case is about an automobile manufacturer that produces luxurious cars. The company follows a…
Q: Project Quality Management addresses the management of project deliverables of the project, it…
A: The practice of continuously assessing the integrity of all operations and implementing remedial…
Q: What is the total holding cost per year, including annual holding cost for safety stock (to the…
A: Given: Annual demand D 25000 Holding cost H 1 Ordering cost S 30 service level 0.95…
Q: If the annual demand is 14,000, the number of working days is 330 in a year, and the delivery lead…
A: As per guideline, expert can only solve first question ' s sub part. So please upload remaining part…
Q: To what extent can ERP help with things like online retail and supply chain management?
A: Enterprise resource planning is referred to as ERP. It tries to combine all organizational divisions…
Q: Favors Distribution Company purchases small imported trinkets in bulk, packages them, and sells…
A: Ans) Basic Table Calculation: Mean and other Calculation: Linear Equation:
Q: The objective of inventory management is to minimize inventory costs while A.having only enough…
A: Ans) Inventory is usually maintained if they are supply shortages or increase in demand. It helps in…
Q: a. What is the project's duration if only nom The project duration is day(s). (Enter y
A: Critical path is a project management technique that helps in the planning and scheduling of a…
Q: How can I effectively collect the necessary information to write a comprehensive operations manual?
A: Operations Manual: Operations Manual is defined as it is a well-structured document…
Q: Ram Roy's firm has developed the following supply, demand, cost, and inventory data Period 1 2 3…
A: Find the Calculation methods below: Given details: Period 1 Period 2 Period 3 Demand 40 60…
Q: She must travel to Kenya to check on quality and transportation. The trip will cost $2,500. The…
A: Cost of the trip (C) = 2500 Cost of handbag (S) = 10 Shipping cost through the postal system (P) = 2…
Q: Use a graphing calculator to create a scatter plot and find the line of best fit and the correlation…
A: Ans) We will use excel as a graphing calculator to plot scatter plot and line of best fit and…
Q: QUESTION 1 The table below shows the sales figures for a brand of shoe over the last 12 months.…
A: Formulae used: (3-month weighted moving average) = (X1× W1+X2× W2+X3 × W3) (W1+W2+W3) where,…
Q: A payoff table is given as s1 s2 s3 d1 250 450 500 d2 300 -250 900 d3 400 500…
A: Expected value method EV=(s1×p1)+(s2×p2)+(s3×p3) Conservative decision-maker A conservative…
Q: What do you mean by importance of quality control and quality assurance for the national and…
A: High certification criteria are upheld by educational agencies. Although the terms acknowledgment…
Q: Increase the amount of special sauce available by 1 ounce and re-solve. Does the solution confirm…
A: We reproduce the Excel as shown below: We solve the problem using Excel Solver as shown in the…
Q: Activities Precedent activity A B C D E F G H ACTIVITIES FOR A CONSTRUCTION a) b) c) d) e) A A B B,…
A: Find the Given details below: Activities Precedent Activity Estimated Time(Weeks) Estimated Cost…
Q: Failures in social responsibility of the mining companies and its implications
A: The mining sector has historically operated in places devoid of social legitimacy, wreaking…
Q: identify critical components of the procurement cycle
A: NOTE: We are allowed to do one question only. Ans 1. Procurement is the process of getting supplies…
Q: What is your forecast for next year’s sales?
A: The least squares method is a statistical technique that is used to estimate the parameters of a…
Q: 3. Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) LOADING... for this…
A: Given data: Overall mean X= = 57.75 lb. Average range R- = 1.54 lb Sample size (n) = 7 Number of…
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 4 images
- Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 9.602 0.033 7 9.603 0.041 2 9.602 0.041 8 9.605 0.034 3 9.593 0.034 9 9.597 0.027 4 9.606 0.051 10 9.601 0.029 5 9.599 0.031 11 9.603 0.039 6 9.599 0.036 12 9.606 0.047 Part 2 For the given data, the x double overbarx = 9.6013 inches (round your response to four decimal places). Part 3 Based on the sampling done, the control limits for 3-sigma x overbarx chart are: Upper Control Limit (UCL Subscript x…Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.)1 9.700 0.044 7 9.703 0.0212 9.700 0.051 8 9.707 0.0583 9.689 0.042 9 9.695 0.0394 9.706 0.037 10…Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 9.602 0.033 7 9.603 0.041 2 9.602 0.041 8 9.605 0.034 3 9.593 0.034 9 9.597 0.027 4 9.606 0.051 10 9.601 0.029 5 9.599 0.031 11 9.603 0.039 6 9.599 0.036 12 9.606 0.047 Part 2 For the given data, the x double overbarx = (inches (round your response to four decimal places)
- Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean(in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 9.402 0.033 7 9.401 0.041 2 9.404 0.041 8 9.407 0.034 3 9.391 0.034 9 9.393 0.027 4 9.406 0.051 10 9.401 0.029 5 9.397 0.031 11 9.403 0.039 6 9.399 0.036 12 9.404 0.047 Part 2 For the given data, the x = enter your response here inches (round your response to four decimal places).Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 13.502 0.033 7 13.501 0.041 2 13.500 0.041 8 13.507 0.034 3 13.489 0.034 9 13.493 0.027 4 13.508 0.051 10 13.501 0.029 5 13.497 0.031 11 13.501 0.039 6 13.499 0.036 12 13.506 0.047 For the given data, the x = nothing inches (round your response to four decimal places). Based on the sampling done, the control limits for 3-sigma x chart are: Upper Control Limit (UCLx) = nothing inches (round your response…Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 10.802 0.044 7 10.803 0.021 2 10.800 0.051 8 10.807 0.058 3 10.791 0.042 9 10.793 0.039 4 10.808 0.037 10 10.803 0.038 5 10.797 0.048 11 10.803 0.054 6 10.801 0.053 12 10.806 0.061 Part 2 For the given data, the x = enter your response here inches (round your response to four decimal places).
- Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Mean (in.) Range (in.) Sample Sample Sample Mean (in.) Range (in.) 1 9.404 0.044 7 9.403 0.021 2 9.402 0.051 8 9.405 0.058 3 9.393 0.042 9.395 0.039 4 9.404 0.037 10 9.401 0.038 9.399 0.048 11 9.401 0.054 9.397 0.053 12 9.404 0.061 For the given data, the x = inches (round your response to four decimal places). Based on the sampling done, the control limits for 3-sigma x chart are: Upper Control Limit (UCL;) = inches (round your response to four decimal places). Lower Control Limit (LCL;) = inches (round your response to four decimal places).Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 11.404 0.044 7 11.403 0.021 2 11.400 0.051 8 11.407 0.058 3 11.389 0.042 9 11.397 0.039 4 11.406 0.037 10 11.403 0.038 5 11.395 0.048 11 11.401 0.054 6 11.397 0.053 12 11.406 0.061 Part 2 For the given data, the x = enter your response here inches (round your response to four decimal places). The control limits for the 3-sigma R-chart are (round all intermediate calculations to three decimal places before…Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 5 pistons produced each day, the mean and the range of this diameter have been as follows: Day Mean (mm) Range R (mm) 158 4.3 151.2 4.4 155.7 4.2 153.5 4.8 156.6 4.5 What is the UCL using 3-sigma?(round your response to two decimal places). 1. 2. 4.
- Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: a) What is the value of X? x= mm (round your response to two decimal places). Day 1 2 3 4 5 Mean x (mm) 158.9 155.2 155.6 157.5 156.6 Range R (mm) 4.2 4.4 4.3 4.8 4.3Twelve samples, each containing five parts, were taken from a process that produces steel rods. The length of each rod is the sample was determined. The results were tabulated and sample means and ranges were computed. Sample Sample Mean (in.) Range (in.) 1 10.001 0.011 2 10.003 0.014 3 9.995 0.007 4 10.007 0.022 5 9.997 0.013 6 9.999 0.012 7 10.001 0.008 8 10.006 0.014 9 9.994 0.005 10 10.002 0.010 11 10.002 0.013 12 10.005 0.009 Determine the upper and lower control limits and the overall means for -chart and R-chart. Chart the charts and plot the values of the sample means and ranges. 3. Does the data indicate a process that is in control? Why or why not?The IRS is concerned with improving the accuracy of tax information given by its representatives over the telephone. Previous studies involved asking a set of 25 questions of a large number of IRS telephone representatives to determine the proportion of correct responses. Historically, the averageproportion of correct responses has been 72 percent. Recently, IRS representatives have been receiving more training. On April 26, the set of 25 tax questions were again asked of 20 randomly selected IRS telephone representatives. The numbers of correct answers were 18, 16, 19, 21, 20, 16,21, 16, 17, 10, 25, 18, 25, 16, 20, 15, 23, 19, 21, and 19. a. What are the upper and lower control limits for the appropriate p-chart for the IRS? Use z = 3. b. Is the tax information process in statistical control?