is the bottleneck b) The bottleneck time is minutes per unit (round your response to two decimal places) minutes (round your response to two decimal places) c) The throughout time of the overall system is d) If the firm operates 10 hours per day, 20 days per month, the monthly capacity of the manufacturing process is units (enter your response as a whole number)

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 111P
icon
Related questions
Question

Operation managemetn

A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and
sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).
Q
a)
is the bottleneck
2 units/hr
Sawing
7 units/hr
Sanding
Drilling
5 units/tir
Welding
2.5 units/hr
Assembly
0.8 units/hr
Assembly
0.8 units/hr
Assembly
0.8 units/hr
3
b) The bottleneck time is minutes per unit (round your response to two decimal places)
c) The throughput time of the overall system is
minutes (round your response to two decimal places)
d) If the firm operates 10 hours per day, 20 days per month, the monthly capacity of the manufacturing process is units (enter your response as a whole number)
Transcribed Image Text:A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q a) is the bottleneck 2 units/hr Sawing 7 units/hr Sanding Drilling 5 units/tir Welding 2.5 units/hr Assembly 0.8 units/hr Assembly 0.8 units/hr Assembly 0.8 units/hr 3 b) The bottleneck time is minutes per unit (round your response to two decimal places) c) The throughput time of the overall system is minutes (round your response to two decimal places) d) If the firm operates 10 hours per day, 20 days per month, the monthly capacity of the manufacturing process is units (enter your response as a whole number)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,