he Electricity Company of Ghana considered to operate three generators  in a lossless system with cost functions C1, C2 and C3 respectively serving a  total of 952 MW load.  C1= P1+0.0625(P1)2   GH₵ / hr  C2= P2+0.0125(P2)2   GH₵ / hr  C3= P3+0.025(P3)2   GH₵ / hr  Assuming a lossless system:   a)  Formulate a minimization cost function from the above information with  its constraint.  b)  Calculate the optimal generation scheduling  c) Determine the constraint cost in GH₵ / hr

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter12: Power System Controls
Section: Chapter Questions
Problem 12.13P
icon
Related questions
icon
Concept explainers
Question

The Electricity Company of Ghana considered to operate three generators 
in a lossless system with cost functions C1, C2 and C3 respectively serving a 
total of 952 MW load. 
C1= P1+0.0625(P1)2   GH₵ / hr 
C2= P2+0.0125(P2)2   GH₵ / hr 
C3= P3+0.025(P3)2   GH₵ / hr 
Assuming a lossless system:  
a)  Formulate a minimization cost function from the above information with 
its constraint. 
b)  Calculate the optimal generation scheduling 
c) Determine the constraint cost in GH₵ / hr 

Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Load flow analysis
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning