g4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Hour R Hour Hour Hour R 1 3.25" 0.65 19 20 3.41" 1.61 7 3.05 0.58" 13 3.01" 0.80" 2 3.10 1.23 8. 2.55 1.13 14 2.83 1.31 2.99 1.14 3 3.22 1.48 9. 2.65 1.13 3.12 2.85 0.71 15 3.22 1.11 21 4. 3.39 1.21 0.50 22 3.18 3.04 10 1.28 16 2.74 0.41 5. 2.97 1.12 1.63 11 12 2.93 1.17 17 2.76 1.48 23 6 2.86 0.37 3.07 0.45 18 2.84 1.24 24 2.74 1.02 on the sampling done, the control limits for 3-sigma x chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): ber Control Limit (UCL-) = inches (round your response to three decimal places). ver Control Limit (LCL:) = inches (round your response to three decimal places). sed on the x-chart, the wire cutting process has been ntrol limits for the 3-sigma R-chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): per Control Limit (UCL2) = inches (round your response to three decimal places). %3D wer Control Limit (LCLR) = inches (round your response to three decimal places). sed on the R-chart, the wire cutting process has been

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem.
Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results:
Hour
Hour
Hour
R
Hour
R.
3.25"
0.65
3.05" 0.58"
13
3.01" 0.80"
19
3.41"
1.61"
2
3.10
1.23
8.
2.55
1.13
14
2.83
1.31
20
2.99
1.14
3
3.22
1.48
3.22
21
2.65
1.13
9,
2.85
3.12
0.71
15
1.11
4.
3.39
1.21
10
1.28
16
2.74
0.50
22
3.18
0.41
1.63
1.02
2.97
1.12
17
23
3.04
11
12
2.93
1.17
2.76
1.48
6.
2.86
0.37
3.07
0.45
18
2.84
1.24
24
2.74
Based on the sampling done, the control limits for 3-sigma x chart are (round all intermediate calculations to three decimal places before proceeding with further calculations):
Upper Control Limit (UCL-)= inches (round your response to three decimal places).
%3D
Lower Control Limit (LCL-)= inches (round your response to three decimal places).
%3D
Based on the x-chart, the wire cutting process has been
The control limits for the 3-sigma R-chart are (round all intermediate calculations to three decimal places before proceeding with further calculations):
Upper Control Limit (UCLR) = inches (round your response to three decimal places).
%3D
Lower Control Limit (LCLR) =
inches (round your response to three decimal places).
%3D
Based on the R-chart, the wire cutting process has been
Transcribed Image Text:Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Hour Hour Hour R Hour R. 3.25" 0.65 3.05" 0.58" 13 3.01" 0.80" 19 3.41" 1.61" 2 3.10 1.23 8. 2.55 1.13 14 2.83 1.31 20 2.99 1.14 3 3.22 1.48 3.22 21 2.65 1.13 9, 2.85 3.12 0.71 15 1.11 4. 3.39 1.21 10 1.28 16 2.74 0.50 22 3.18 0.41 1.63 1.02 2.97 1.12 17 23 3.04 11 12 2.93 1.17 2.76 1.48 6. 2.86 0.37 3.07 0.45 18 2.84 1.24 24 2.74 Based on the sampling done, the control limits for 3-sigma x chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCL-)= inches (round your response to three decimal places). %3D Lower Control Limit (LCL-)= inches (round your response to three decimal places). %3D Based on the x-chart, the wire cutting process has been The control limits for the 3-sigma R-chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCLR) = inches (round your response to three decimal places). %3D Lower Control Limit (LCLR) = inches (round your response to three decimal places). %3D Based on the R-chart, the wire cutting process has been
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.