Question

Dear weber,

Unfortunately, my question always has no unable to answer. Here, I want to help you to solve my question.

The Answer to my last question regarding the formulation of the problem is:

The Reliance Manufacturing Company produces an aircraft part. The company can produce the part entirely at a flexible work center with multiple computerized machines. The company has four work centers, all of which are different because they were purchased at different times. Each work center has a single operator; however, the company’s operators have different skill levels, resulting in different levels of daily output and product quality. The following tables show the average daily output and an average number of defects per day for each of the company’s five operators who are capable of producing the aircraft part:

Table 1

Operator

Average Daily Output per Machine

A

B

C

D

1

18

20

21

17

2

19

15

22

18

3

20

20

17

19

4

24

21

16

23

5

22

19

21

21

Table 2

Operator

Average Number of Defects per Machine

A

B

C

D

1

0.3

0.9

0.6

0.4

2

0.8

0.5

1.1

0.7

3

1.1

1.3

0.6

0.8

4

1.2

0.8

0.6

0.9

5

1.0

0.9

1.0

1.0

The company wants to determine which operator to assign to each machine to maximize daily output and keep the percentage of defect to less than 4%.

  1. Formulate a 0-1 integer programming model for this problem
  2. Solve this model by using the computer

 

SOLUTION:

  1. Decision Variable
  • Define 0 - 1 variables related to the Operator for Output at each Machine as :

      Xij      = 1 if Operator i is selected to operate Machine j

= 0 if Operator i is not selected to operate Machine j

  • Assume 0 – 1 variables related to the Operator for defects at each Machine as :

      Yij      = 1 if Machine j is selected for operator i

= 0 if Machine j is not selected for operator i

      i        = Operator 1, 2, 3, 4, 5

      j        = Machine A, B, C, D

  1. Objective Function

The objected Function for the given model will be

Z          =

Maximize               Z = 18 X1A + 20 X1B + 21 X1C + 17 X1D + 19 X2A + 15 X2B + 22 X2C + 18 X2D + 20 X3A + 20 X3B + 17 X3C + 19 X3D + 24 X4A + 21 X4B + 16 X4C + 23 X4D + 22 X5A + 19 X5B + 21 X5C + 21 X5D

  1. Constraints are:

Subject to            Total Defects ≤ 4% x Total Production (Output Machine)

0,3 X1A + 0,9 X1B + 0,6 X1C + 0,4 X1D + 0,8 X2A + 0,5 X2B + 1,1 X2C + 0,7 X2D + 1,1X3A + 1,3 X3B + 0,6 X3C + 0,8 X3D + 1,2 X4A + 0,8 X4B + 0,6 X4C + 0,9 X4D + 1 X5A + 0,9 X5B + 1 X5C + 1 X5D  ≤  0,04 .  Z

X1A + X1B + X1C + X1D                                ≤             1              (Operator 1 Constraint)

X2A + X2B + X2C + X2D                                        ≤             1              (Operator 2 Constraint)

X3A + X3B + X3C + X3D                          ≤             1              (Operator 3 Constraint)

X4A + X4B + X4C + X4D                          ≤             1              (Operator 4 Constraint)

X5A + X5B + X5C + X5D                          ≤             1              (Operator 5 Constraint)

Y1A + Y2A + Y3A + Y4A + Y5A                 =             1              (Machine 1 Constraint)

Y1B + Y2B + Y3B + Y4B + Y5B                          =             1              (Machine 2 Constraint)

Y1C + Y2C + Y3C + Y4C + Y5C                 =             1              (Machine 3 Constraint)

Y1D + Y2D + Y3D + Y4D + Y5D                                        =             1              (Machine 4 Constraint)

X are variable 0 or 1.

Y is variable 1.

 

I hope the answer can help in solving this problem, have a nice day..

 

Regards,

HHn

 

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Inventory management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,