EXAMPLE A -2% grade meets a +8% gradę near an underpass. In order to maintain the minimum clearance allowed under the bridge and at the same time introduce a vertical transition curve in the grade line,´it is necessary to use a curve that lies 400-m on one side of the vertex of the straight grade and 240-m on the other. The station of the beginning of the curve (4o0-m side) is 10+000 and its elevation is 200-m. Determine the stationing of the lowest point in the curve а. b. Determine the elevation at station 10+o8o. с. Determine the elevation of PVT.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
EXAMPLE
A -2% grade meets a +8% gradę near an underpass. In order to maintain the
minimum clearance allowed under the bridge and at the same time introduce
a vertical transition curve in the grade line, it is necessary to use a curve that
lies 400-m on one side of the vertex of the straight grade and 240-m on the
other. The station of the beginning of the curve (400-m side) is 10+0oo and its
elevation is 200-m.
Determine the stationing of the lowest point in the curve
а.
b. Determine the elevation at station 10+080.
С.
Determine the elevation of PVT.
d. If the uphill edge of the underside of the bridge is at station 10+440 and at
elevation 203.41-m, what is the vertical clearance under the bridge at this
point?
Transcribed Image Text:EXAMPLE A -2% grade meets a +8% gradę near an underpass. In order to maintain the minimum clearance allowed under the bridge and at the same time introduce a vertical transition curve in the grade line, it is necessary to use a curve that lies 400-m on one side of the vertex of the straight grade and 240-m on the other. The station of the beginning of the curve (400-m side) is 10+0oo and its elevation is 200-m. Determine the stationing of the lowest point in the curve а. b. Determine the elevation at station 10+080. С. Determine the elevation of PVT. d. If the uphill edge of the underside of the bridge is at station 10+440 and at elevation 203.41-m, what is the vertical clearance under the bridge at this point?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Structural components of framed construction
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning