ASSIGNMENT NO.1 For the power system shown in Fig.(1). The transmission lines are identical, and each can be represented by a series impedance of (0.0101 + j 0.0505)pu on 100MVA base. The voltage magnitude at bus2 is kept at 1.03 pu. The bus data are shown on the figure: 1. What functions do the swing bus and PV buses in load flow calculations have? How should they be selected? 2. Write the bus admittance matrix for the given system. 3. Obtain the load flow solution by using Gauss-Seidel method. Perform one iteration 4. Calculate the line losses for the line connecting bus2 to bus 3. 5. Calculate the slack bus power generation. P2= 150 MW PIVI bus 1 IVl=1.03 pu Slack bus Vi=1.0240° pu Sp3= Spi= 30 MW +j10 MVAR 50 MW +j25 MVAR Spz= 20 MW +j5 MVAR Fig. (1)

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter6: Power Flows
Section: Chapter Questions
Problem 6.43P
icon
Related questions
Question
i need the answer quickly
ASSIGNMENT NO.1
For the power system shown in Fig.(1). The transmission lines are identical, and each can be
represented by a series impedance of (0.0101 + j 0.0505)pu on 100MVA base. The voltage
magnitude at bus2 is kept at 1.03 pu. The bus data are shown on the figure:
1. What functions do the swing bus and PV buses in load flow calculations have? How
should they be selected?
2. Write the bus admittance matrix for the given system.
3. Obtain the load flow solution by using Gauss-Seidel method. Perform one iteration
4. Calculate the line losses for the line connecting bus2 to bus 3.
5. Calculate the slack bus power generation.
P2=
150 MW
PIVI bus
1
IV,l=1.03 pu
3
Slack bus
Vı=1.0240° pu
Sp3=
Spi=
30 MW +j10 MVAR
50 MW +j25 MVAR
Sp2=
20 MW +j5 MVAr
Fig. (1)
Transcribed Image Text:ASSIGNMENT NO.1 For the power system shown in Fig.(1). The transmission lines are identical, and each can be represented by a series impedance of (0.0101 + j 0.0505)pu on 100MVA base. The voltage magnitude at bus2 is kept at 1.03 pu. The bus data are shown on the figure: 1. What functions do the swing bus and PV buses in load flow calculations have? How should they be selected? 2. Write the bus admittance matrix for the given system. 3. Obtain the load flow solution by using Gauss-Seidel method. Perform one iteration 4. Calculate the line losses for the line connecting bus2 to bus 3. 5. Calculate the slack bus power generation. P2= 150 MW PIVI bus 1 IV,l=1.03 pu 3 Slack bus Vı=1.0240° pu Sp3= Spi= 30 MW +j10 MVAR 50 MW +j25 MVAR Sp2= 20 MW +j5 MVAr Fig. (1)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
8086 Microprocessor
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning