An underpass crossing a reinforced concrete bridge along the Shaw Blvd. has a downward grade of - 4% meeting an upward grade of +8% at the vertex V al elevation 70 m, and stationing of 7 + 700, exactly underneath the center line of the bridge having a width of 10 m: If the required minimum clearance under the bridge is 5 m, and the elevation of the bottom of the bridge is 78.10 m. (a) Determine the length of the vertical parabolic curve that shall connect the two tangents in m. (b) Determine the stationing of the point where a catch basin will be placed. (c) Determine the elevation of the point where a catch basin will be placed in m.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

do not roud off and do not shortut

An underpass crossing a reinforced concrete bridge along the Shaw Blvd. has a downward grade of -
4% meeting an upward grade of +8% at the vertex V al elevation 70 m, and stationing of 7 + 700,
exactly underneath the center line of the bridge having a width of 10 m: If the required minimum
clearance under the bridge is 5 m, and the elevation of the bottom of the bridge is 78.10 m. (a)
Determine the length of the vertical parabolic curve that shall connect the two tangents in m. (b)
Determine the stationing of the point where a catch basin will be placed. (c) Determine the elevation of
the point where a catch basin will be placed in m.
Transcribed Image Text:An underpass crossing a reinforced concrete bridge along the Shaw Blvd. has a downward grade of - 4% meeting an upward grade of +8% at the vertex V al elevation 70 m, and stationing of 7 + 700, exactly underneath the center line of the bridge having a width of 10 m: If the required minimum clearance under the bridge is 5 m, and the elevation of the bottom of the bridge is 78.10 m. (a) Determine the length of the vertical parabolic curve that shall connect the two tangents in m. (b) Determine the stationing of the point where a catch basin will be placed. (c) Determine the elevation of the point where a catch basin will be placed in m.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Highway drainage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning