A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant II needs at least 32 engines. The companyan send at most 120 engines to these assembly plants. It costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant Il gives similar $15 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost? How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints? The number of engines to send to plant I is The number of engines to send to plant II is

College Algebra (MindTap Course List)
12th Edition
ISBN:9781305652231
Author:R. David Gustafson, Jeff Hughes
Publisher:R. David Gustafson, Jeff Hughes
Chapter6: Linear Systems
Section6.8: Linear Programming
Problem 5SC: If during the following year it is predicted that each comedy skit will generate 30 thousand and...
icon
Related questions
Topic Video
Question
Help ?please I’m having trouble
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant II needs at least 32 engines. The companyan send at most 120 engines to these assembly plants. It
costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant Il gives similar $15 rebates. The
manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost?
How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints?
The number of engines to send to plant I is
The number of engines to send to plant II is
Transcribed Image Text:A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant II needs at least 32 engines. The companyan send at most 120 engines to these assembly plants. It costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant Il gives similar $15 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost? How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints? The number of engines to send to plant I is The number of engines to send to plant II is
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 6 images

Blurred answer
Knowledge Booster
Hypothesis Tests and Confidence Intervals for Means
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, calculus and related others by exploring similar questions and additional content below.
Recommended textbooks for you
College Algebra (MindTap Course List)
College Algebra (MindTap Course List)
Algebra
ISBN:
9781305652231
Author:
R. David Gustafson, Jeff Hughes
Publisher:
Cengage Learning
Algebra: Structure And Method, Book 1
Algebra: Structure And Method, Book 1
Algebra
ISBN:
9780395977224
Author:
Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. Cole
Publisher:
McDougal Littell
Intermediate Algebra
Intermediate Algebra
Algebra
ISBN:
9780998625720
Author:
Lynn Marecek
Publisher:
OpenStax College