A 600 mm diameter and 25 m long driven concrete pile car- ries a column load of 1200 kN. It is estimated that the shaft carries 900 kN and the point carries 300 kN. Determine the settlement of the pile head using the Poulos and Davis method with the following data: E = 25 MN/m², E = 30,000 MN/m², and μ, = 0.2

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter18: Pile Foundation
Section: Chapter Questions
Problem 18.21P: Refer to Figure 18.26b. Let L = 15.24 m, fill = 17.29 kN/m3, sat(clay) = 19.49 kN/m3, clay = 20, Hf...
icon
Related questions
Question
12.20 A 600 mm diameter and 25 m long driven concrete pile car-
ries a column load of 1200 kN. It is estimated that the shaft
carries 900 kN and the point carries 300 kN. Determine
the settlement of the pile head using the Poulos and Davis
method with the following data:
E = 25 MN/m², Ep = 30,000 MN/m², and μ = 0.2
Transcribed Image Text:12.20 A 600 mm diameter and 25 m long driven concrete pile car- ries a column load of 1200 kN. It is estimated that the shaft carries 900 kN and the point carries 300 kN. Determine the settlement of the pile head using the Poulos and Davis method with the following data: E = 25 MN/m², Ep = 30,000 MN/m², and μ = 0.2
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 21 images

Blurred answer
Knowledge Booster
Braced cuts
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning