Three turbines each of capacity 10000 kW are installed at a hydel power station. If the peak load and the average load produced during a certain period are 25000 kW and 15000 kW respectively, then load factor and plant factor are respectively equal to (a) 60% and 50% (b) 50% and 60% (c) 40% and 50% (d) 50% and 40%

Sustainable Energy
2nd Edition
ISBN:9781337551663
Author:DUNLAP, Richard A.
Publisher:DUNLAP, Richard A.
Chapter18: Energy Storage
Section: Chapter Questions
Problem 20P
icon
Related questions
Question
Urgent sir
6. Three turbines each of capacity 10000 kW are
installed at a hydel power station. If the peak
load and the average load produced during a
certain period are 25000 kW and 15000 kW
respectively, then load factor and plant factor
are respectively equal to
(a) 60% and 50%
(b) 50% and 60%
(c) 40% and 50%
(d) 50% and 40%
Transcribed Image Text:6. Three turbines each of capacity 10000 kW are installed at a hydel power station. If the peak load and the average load produced during a certain period are 25000 kW and 15000 kW respectively, then load factor and plant factor are respectively equal to (a) 60% and 50% (b) 50% and 60% (c) 40% and 50% (d) 50% and 40%
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Team Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,