.) The plan-view sketches of benchmark leveling run is shown below. Along each line representing a sight is the value of the rod reading for that sight. The numbering of the TPS shows the direction of the level run. Place the data in the form of the field notes table. Include arithmetic check. Determine the misclosure error in the survey. BM 14, 48.292 7.485 TP 1 2.641 10.260 3.982 1.485 8.643 TP 2 TP 3 9.829 2.247 7.642 8.636 BM 38

Np Ms Office 365/Excel 2016 I Ntermed
1st Edition
ISBN:9781337508841
Author:Carey
Publisher:Carey
Chapter3: Performing Calculations With Formulas And Functions
Section3.2: Cell References And Formulas
Problem 8QC
icon
Related questions
Question
3.) The plan-view sketches of benchmark leveling run is shown below. Along each line
representing a sight is the value of the rod reading for that sight. The numbering of the
TPS shows the direction of the level run. Place the data in the form of the field notes
table. Include arithmetic check. Determine the misclosure error in the survey.
BM 14,
48.292
7.485
TP 1
2.641
10.260
3.982
1.485
8.643 TP 2
TP 3
9.829
2.247
7.642
8.636
BM 38
Transcribed Image Text:3.) The plan-view sketches of benchmark leveling run is shown below. Along each line representing a sight is the value of the rod reading for that sight. The numbering of the TPS shows the direction of the level run. Place the data in the form of the field notes table. Include arithmetic check. Determine the misclosure error in the survey. BM 14, 48.292 7.485 TP 1 2.641 10.260 3.982 1.485 8.643 TP 2 TP 3 9.829 2.247 7.642 8.636 BM 38