Hodges ICS 201 W5

.docx

School

American Military University *

*We aren’t endorsed by this school

Course

498

Subject

Industrial Engineering

Date

Apr 3, 2024

Type

docx

Pages

4

Uploaded by CountRhinoceros1447 on coursehero.com

INCIDENT BRIEFING (ICS 201) 1. Incident Name: Bobsville Earthquake Week 5 2. Incident Number: 01 3. Date/Time Initiated: Date: 10/29/2023 Time: 1700 4. Map/Sketch (include sketch, showing the total area of operations, the incident site/area, impacted and threatened areas, overflight results, trajectories, impacted shorelines, or other graphics depicting situational status and resource assignment) : 5. Situation Summary and Health and Safety Briefing . A magnitude 7.0 earthquake has hit the city causing severe damage. Multiple building collapses, structure fires, gas leaks and other calls for service are currently active. The nuclear plant plans to shut down power to the city so that it can assess for any damages to the facility. The hospital is running on backup power at this time and has sustained damage to the lower section of the building to include the morgue and lab. The school has also sustained a collapse with an estimated 100 students and faculty trapped or injured. We have noticed some comms degradation, resources have been requested. The Governor has approved a SOE Declaration for the Incident. Always wear proper PPE for your job Be prepared for aftershocks and further structural collapse Ensure that you are staying hydrated and eating adequately. Always stay in communications with your chain of command and ensure they know your status/ location at all times. 6. Prepared by: Name: Jonathan Hodges Position/Title: Incident Command Signature: ICS 201, Page 1 Date/Time: 10/29/2023 1700
INCIDENT BRIEFING (ICS 201) 1. Incident Name: Bobsville Earthquake Week 5 2. Incident Number: 01 3. Date/Time Initiated: Date: 10/29/2023 Time: 1700 7. Current and Planned Objectives: Command Staff: Will continuously monitor the status of the event and adjust plans accordingly as well as ensure the safety of the event. Operations: Continue to respond to calls for service, work to stabilize the incident and prevent further loss of life or property. Calls for service should begin to be prioritized to ensure resources are being used to maximum ability Planning: Continue to track incoming and assigned resources and continue to work towards establishing a planning cycle for the incident. Finance: Continue to track expenses and spend responsibly, ensure you are coordinating with operations and properly tracking time for personnel and equipment for reimbursement since we now have an SOE. Logistics: Continue to work on ordering the resources and equipment that are needed. Ensure that the units supply leader is distributing these items, communications unit is maintaining our channels and look at alternate means for comms if needed and that your medical unit is working with ops and the safety officer to ensure the safety of all responders. 8. Current and Planned Actions, Strategies, and Tactics: Time: Actions: 0913 Bobsville experienced an earthquake that lasted for appx. 45 seconds 0927 Bobsville Mayor contacts EOC Manager to activate EOC/ Backup EOC is established 1031 Call for service at the Grocery Store/ structural collapse with possibly 17 victims inside. UNITS OS 1047 Call for service at the DMV/ structural collapse unknown number of victims. UNITS OS 1104 Call for service at Diner and Laundry Mat/ structural collapse with gas leak. UNITS OS 1121 Call for service/ Trapped elderly male inside of house unknown situation. UNITS OS 1130 Bobstown mutual aid arrives on scene 1203 Nuclear plant advises they will be shutting off power to perform damage assessment. Rep from plant req to report to EOC, CIKR informed of same and advised if alternate needed power sources to req w/EOC 1230 USGS rates earthquake a 7.0 and to prepare for aftershocks. All units advised to prepare for aftershocks entry into collapsed buildings halted for safety concerns. 1311 Bobsville Hosp reports they are running on emergency power and a structural collapse of the morgue/ lab units sent to survey damage, mobile morgue requested. 1342 Laundry mat explosion. Units already on scene and working same. 1402 Reports of lost contact with the school LEO unit sent to school to survey. School rep requested to report to EOC w/ reunification plans for the school 1440 Call for service of a structure fire @ Stetson residence. Units en route 1450 Update from school of a structural collapse with a reported 100 students and faculty injured. No report from an on scene unit at this time. Requests made for additional Type I USAR teams if needed. 6. Prepared by: Name: Jonathan Hodges Position/Title: Incident Command Signature: ICS 201, Page 2 Date/Time: 10/29/2023 1700
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help