Calculate number of transit mixers (TM) required for transporting concrete from central batching plant to site. The cycle time data of a 6 m² typical transit mixers is given below: O Loading time of TM = 6.0 minutes. O Travel time of loaded TM to site= 30 minutes. Average waiting time at site = 5.0 minutes Discharge time of concrete at site through concrete pump = 15 minutes. O Travel time for return trip =24 minutes. If the central batching plant having average output of 60 m³/hr is to run continuously, work out the requirement of no. of concrete pumps TM.

Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter5: Separation Processes
Section: Chapter Questions
Problem 5.14P: Two materials, A and B, are to be separated using two unit operations, 1 and 2. The feed has 10...
icon
Related questions
Question
Calculate number
of transit mixers
(TM) required for
transporting concrete
from central batching
plant to site. The cycle
time data of a 6 m³
typical transit mixers is
given below:
O Loading time of TM =
6.0 minutes.
O Travel time of loaded TM
to site= 30 minutes.
Average waiting time at
site = 5.0 minutes
Discharge time of
concrete at site through
concrete pump = 15
minutes.
Travel time for return trip
= 24 minutes.
If the central batching
plant having average
output of 60 m³/hr is to
run continuously, work
out the requirement of
no. of concrete pumps
and TM.
Transcribed Image Text:Calculate number of transit mixers (TM) required for transporting concrete from central batching plant to site. The cycle time data of a 6 m³ typical transit mixers is given below: O Loading time of TM = 6.0 minutes. O Travel time of loaded TM to site= 30 minutes. Average waiting time at site = 5.0 minutes Discharge time of concrete at site through concrete pump = 15 minutes. Travel time for return trip = 24 minutes. If the central batching plant having average output of 60 m³/hr is to run continuously, work out the requirement of no. of concrete pumps and TM.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Methods to determine productivity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,